Route 42 at Route 809 Augusta County

Area Map

Click to view full-size map

Project at a Glance

Cost
Estimate $1,760,000

Locality
Augusta

District
Staunton

Contact
John-Allen Ennis, P.E.
(540) 332-7891

What's being done?

The proposed improvements are located between 0.63 mile and 0.9 mile south of the Rockingham County line. The intersection of Route 42 and Route 809 will be realigned to improve sight distance.

This project will replace an existing bridge on Route 42, built in 1908, over a tributary to Mossy Creek. The proposed work will also improve the road alignment, shoulders and drainage. Route 42 will have two 12-foot travel lanes with eight-foot shoulders that will include four feet of paved shoulder.

Features

This portion of Route 42 is located between a National Historic Registered house and its spring house. The new alignment will help straighten Route 42 by relocating the road north of the spring house.

This project will not require the relocation of any families, businesses or non-profit organizations.

An environmental document, prepared under the National Environmental Policy Act in the form of a categorical exclusion, was prepared for this project and will be available at the public hearing. In compliance with the National Historic Preservation Act, Section 106 and 36 CFR Part 800, information concerning the potential effects of the proposed improvement on properties listed in or eligible for listing in the National Register of Historic Places will be available at the public hearing.

The estimated cost of this project is $1,760,000, which includes $242,000 for preliminary engineering, $206,000 for right of way acquisition and utility relocation and $1,312,000 for construction.

During Construction

During construction property owners and residents will have access to their entrances. However, a detour will be in place on Route 42 for both northbound and southbound traffic. The detour will use Route 646 (Fadley Road) and Route 699 (Centerville Road). The detour is anticipated to extent the travel time through this area from four to seven minutes. Travelers should anticipate the detour to be in place for one to two months.

What's next?

The project will receive consideration for design approval from the VDOT Chief Engineer in mid 2008. Right of way activities will begin in late 2008 with construction advertisement in early 2010.

Contacts

John-Allen Ennis, P.E., (540) 332-7891