Under Construction: Route 634 Bridge Replacement (Hardy Road)

Cost and schedule ►


Traffic alerts ►

Public outreach ►

The new Route 634 (Hardy Road) bridge over the Roanoke River at Smith Mountain Lake was opened to traffic in August 2019. The bridge replacement project is still underway and is expected to be completed by December 2019. The location for the work is 0.19 mile west of the Franklin County line to 0.12 mile east of the Bedford County line. 


Below, the Route 634 bridge is pictured with barge in the water during construction.

Hardy Road Bridge

Benefits 

The Hardy Ford Bridge is being replaced.

Resources

Contact Info:

Patrick Rodgers

Lat/Long: 37.2116075, -79.8075279

Locality: Bedford

Page last modified: Nov. 4, 2019