Coming Soon
Route 620/Mill Quarter Rd. in Powhatan |
| Safety improvements |
Area Map

Route 620 location map
Project at a Glance
Begin Date
Anticipated May 2010
Est Completion Date
August 2010
Cost
Approx. $1.2 million
Locality
Powhatan
District
Richmond
Anticipated May 2010
Est Completion Date
August 2010
Cost
Approx. $1.2 million
Locality
Powhatan
District
Richmond
Contact
Michael Tatom
804.524.6407
What's Being Done
The proposed project involves realigning two hazardous curves and adjusting intersections along Mill Quarter Road. The pavement is to be widened from 18 feet to 24 feet. The shoulders and ditches are to be improved to 8 feet and 6 feet, respectively. Drainage will be improved with the replacement of cross-pipes and entrance pipes.A design public hearing was held on Sept. 26, 2007.
Benefits
After realigning the two hazardous curves, road safety should be improved, resulting in reduced accidents in this area.
Impact on Traffic
The existing two lanes of travel will be available during construction. There will be some flagging operations in key locations that will reduce the lanes temporarily to one lane during off-peak hours. No construction is anticipated during nighttime hours.Contacts
Michael Tatom, 804.524.6407Public Affairs, 804.524.6387