Recently Completed: Nash Road (Route 636) Bridge Replacement

Cost and schedule ►

Public outreach ►

The project, completed in August 2019, replaced the aging Route 636 bridge over the Rita Branch Creek with a new structure on the existing alignment. The former structure was built in 1951 and was substandard to handle future traffic volumes. 

Benefits 

Project improvements included a wider bridge with the weight restriction removed.

Resources

Contact Info:

Robert Poutier
804-892-5076

Phase: Complete

UPC: 103469

State ID: 0636-020-653, P101, R201, C501, B694

Federal ID: STP-5A27(235)

Lat/Long: 37.299518, -77.564339

Locality: Chesterfield

Page last modified: Aug. 13, 2019