Map of construction project districts

Under Construction

I-95 bridge at Lewistown Road, Hanover

Bridge widening and reconstruction

Project Photos

Project at a Glance

Begin Date
Spring 2015

Est Completion Date
Winter 2017

Phase
Construction

Cost
$30 million

Lengths and Limits
0.64 miles

Locality
Hanover

District
Richmond

Contact
Brian Ramsey
(804) 752-5538

Traffic Impacts

Ramp from Lewistown Rd. west to I-95 south

The ramp from Lewistown Rd. (Rt. 802) west to I-95 south will be closed beginning on Wednesday, December 7 at 9 a.m. Drivers should follow the posted detour through July 2017.

I-95/Lewistown Rd. traffic impacts

The new ramp from I-95 north to Lewistown Rd. opened on Nov. 9, 2016. A temporary traffic signal has been added to the intersection with Lewistown Rd.  

I-95 reduced speed limit in work zone

The speed limit on Interstate 95 has been reduced near the Lewistown Rd. interchange for the ongoing work zone. The speed limit has been reduced from 70 mph to 55 mph southbound and from 65 mph to 55 mph northbound.

Project Description

The existing Lewistown Road bridge over I-95 is 14 feet, 7 inches high--below the standard height for bridges. The reconstructed bridge will be 16 feet, 5 inches high to meet current standards. In addition, the bridge will be widened to accommodate two westbound lanes and one eastbound lane. Turn lanes will be added to Lewistown Road at the I-95 intersection, truck stop and Airpark Road.

Aerial maps of the project (PDF)

Overview (14 MB)

West of I-95 (9 MB)

East of I-95 (9 MB)

South of Lewistown Road (8 MB)

Progress photos

Public Involvement

A design public hearing was held October 11, 2012. Brochure

A citizen information meeting was held May 11, 2015. Fact sheet

Bristol area projects Salem area projects Staunton area projects Lynchburg area projects Culpeper area projects Richmond area projects Northern Virginia projects Fredericksburg area projects Hampton Roads projects
Page last modified: Dec. 6, 2016