Under Construction: Chesterfield - Winterpock Rd. (Rt. 603) Bridge Replacement

Cost and schedule ►


Traffic alerts ►

The primary purpose of this project is to replace a bridge over Winterpock Creek. The project will impact Winterpock Rd. (Rt. 603) between Coalboro Rd. and Black Rd. Local traffic will be able to access property during work. 

Built in 1945, the existing bridge will be replaced by one which will meet today's standards in materials, construction techniques, and durability. The new structure will not have a posted weight limit. The new bridge will have a roadway width of 26 feet (2 x 10 feet lanes) and a length of 35 feet and 5 inches, approximately 7 feet wider and 12 feet longer than the existing structure.
The guardrail system will also be updated and extended for improved safety. 

During work, drivers should follow the posted detour route:

  • From eastbound Winterpock Rd. – Turn right onto Coalboro Rd., left onto River Rd., left onto Black Rd. back to Winterpock Rd.
  • From westbound Winterpock Rd. – Turn left onto Black Rd., right onto River Rd., right onto Coalboro Rd. back to Winterpock Rd

Benefits 

The project will replace the bridge at Winterpock Creek to meet today's standards and improve safety.

Resources

Contact Info:

Kevin O'Neill
804-638-0083

Phase: Under Construction

UPC: 113640

State ID: 9999-964-581

Lat/Long: 37.346118,-77.7221897

Locality: Chesterfield

Page last modified: May 18, 2020