Map of construction project districts

Recently Completed

Arlington Boulevard Pedestrian Bridge

A new crossing at Seven Corners in Fairfax County

Area Map

Project Photos

Project at a Glance

Begin Date
Oct. 22, 2007

Est Completion Date
May 20, 2009

Locality
Fairfax

District
Northern Virginia

Contact
Larry Lethcoe, Construction Manager
(703) 536-1180

What's Being Done

Route 50 Ped BridgeVDOT opened the pedestrian bridge and fence over Arlington Boulevard (Route 50) on May 20, 2009. The bridge will provide a safer route for pedestrians and cyclists in the area, linking the Seven Corner's Shopping Center with the residential community of Willston, two blocks from the Fairfax and Arlington County boundary.

The $5.2 million bridge is 141 feet long, with three-story stairwells at either end, and bicycle and wheel chair access ramps that stretch for nearly 300 feet on both sides of the bridge. Included in the project are trees and shrubbery at various locations on the site, flower beds at the landing of the ramps and an ornamental fence on both the east and westbound side of Route 50. A sidewalk was installed from Peyton Randolph Drive to the Willston Shopping Center.

Contacts

Larry Lethcoe, Construction Manager, (703) 536-1180
Mahmud M. Hussain, Resident Administrator, 703-383-2730
Bristol area projects Salem area projects Staunton area projects Lynchburg area projects Culpeper area projects Richmond area projects Northern Virginia projects Fredericksburg area projects Hampton Roads projects

Page last modified: Nov. 16, 2009