I-66 and Route 29

Repairs to the I-66 Exit 52 bridge in Centreville

Project at a Glance

Begin Date
May 29, 2014

Est Completion Date
October 28, 2014

Cost
Approximately $2.1 million

Locality
Fairfax

District
Northern Virginia

Contact
Dinesh Singh, P.E.
Project Manager
703-259-2216
Chan B. Basnayake, P.E., PMP
Area Construction Engineer
703-259-2947

About the Project

This project consists of repairs to both the I-66 eastbound and westbound bridges over Route 29 in Centreville (Exit 52).  Recent repairs to the steel beams and substructure were completed in 2012.  The deck overlay and joint reconstruction were not completed. The scope of this project is to complete the deck overlay, approach road overlay, and joint reconstruction.

The project's cost is approximately $2.1 million.

Construction began on May 29, 2014.  The project's estimated completion date is October 28, 2014.

Traffic Impacts

The work is being accomplished through nighttime lane closures on I-66. On Route 29, through lane and left-turn lane closures will be required to repair the bridge directly above the roadway.

Resources

Project Plans 1

Project Plans 2

Project Plans 3

 

UPC: 103924
State Project #: 0066-029-070, P102, P101, B619, B620

 

 

Bristol area projects Salem area projects Staunton area projects Lynchburg area projects Culpeper area projects Richmond area projects Northern Virginia projects Fredericksburg area projects Hampton Roads projects
Page last modified: Aug. 13, 2014