I-395 South Widening - Duke Street To Edsall Road

Providing a fourth through lane in Alexandria and Fairfax

Area Maps

Project Photos

Project at a Glance

Begin Date
TBD

Locality
Alexandria and Fairfax

District
Northern Virginia

Contact
Calvin Britt, P.E.
Project Manager
703-259-2961
Charles "Mel" Harvey, P.E.
Area Construction Engineer
703-259-3234

About the Project

This project will construct a fourth through lane on southbound I-395 between Duke Street and Edsall Road.

Currently, there are four southbound through lanes north and south of the project corridor, but only three through lanes within the project limits. The additional lane constructed with this project will fill the gap to eliminate the bottleneck through the Landmark area.

Cost Estimate
Preliminary engineering - $6.5 million

Currently this project is funded for design engineering only. Provision of additional project funding will be revised as the project's design, cost estimate and delivery schedule is refined.

Resources

Preferred Alternative (August 2014)
Congestion Relief Feasibility Study: Draft Operational and Geometrical Analysis (July 2012)
 

UPC: 103316
State Project: 0395-029-015,P101