Map of construction project districts

Under Construction

I-395 South Widening - Duke Street To Edsall Road

Providing a fourth through lane in Alexandria and Fairfax

Area Maps

Project Photos

Project at a Glance

Locality
Alexandria and Fairfax

District
Northern Virginia

Contact
Transurban

Susan Shaw, P.E.
VDOT Project Manager

Amanda Baxter
Environmental Lead

Note: This project is being constructed as part of the I-395 Express Lanes Extension.

About the Project

This project is constructing a fourth through lane on southbound I-395 between Duke Street and Edsall Road.

Prior to construction, there were four southbound through lanes north and south of the project corridor, but only three through lanes within the project limits. The additional lane constructed with this project will fill the gap to eliminate the bottleneck through the Landmark area.

When complete, drivers will have four continuous lanes southbound for 2.7 miles from South of Edsall Road (Route 648) to North of Duke Street (Route 236).

Resources

Interchange Modification Report  | Appendices (333 MB) (May 2017)

Supplemental design public hearing (Oct. 2016): Brochure | Comment sheet | Frequently asked questions | Typical sections | Corridor overview | Display boards: 1 2 3 4 5 6

Design public hearing (April 2016): Brochure | Display boards: 1 2 3 4 5 |
Frequently asked questions | Typical sections

Public information meeting aerial overview display boards (Feb. 2015): 1 | 2 | 3 | 4 | 5 | Corridor overview

Preferred Alternative (Aug. 2014)

Congestion Relief Feasibility Study: Draft Operational & Geometrical Analysis (July 2012)

Project Numbers
UPC: 103316
State: 0395-029-015, P101