I-395 Shirlington Interchange Improvements Study

Safety and operational enhancements in the City of Alexandria and Arlington County

Area Maps

Project at a Glance

Begin Date
July 2015

Est Completion Date
Winter 2018/19

Phase
Study

Cost
$1.6 million

Lengths and Limits
Shirlington interchange to Glebe Rd

Locality
Alexandria and Arlington

District
Northern Virginia

Contact
Olivia Daniszewski
Preliminary Engineering

About the Study

This study is assessing safety and operational improvements at the I-395 Shirlington interchange (Exit 6), as well as at the following:

  • Ramp from South Glebe Road (Route 120) to southbound I-395
  • Intersection of South Shirlington Road and South Arlington Mill Drive
  • Intersection of Gunston Road and Martha Custis Drive

The study collected data on traffic volumes and vehicle movements, and identified safety and operational issues. Alternatives have been identified, which aim to reduce congestion, crashes, and boost the interchange's overall performance.

The study is being financed with federal funds.

A detailed analysis of selected alternatives occurred in summer 2018. The final report detailing the preferred alternative will be issued in winter 2018/19.

Schedule
Interim Public Information Meeting - May 2018
Analysis of Selected Alternatives - Summer 2018
Final Public Information Meeting - Late Fall 2018
Issue Final Report - Winter 2018/19

Resources

Public Information Meeting - May 2018 (Ad)
Meeting Materials and Displays

Project Numbers
State: 0395-100-842, P101
UPC: 107831
Federal: OC-395-4 (187)