Gum Spring Road Safety Improvements

Guardrail, lane and shoulder improvements in Loudoun County

Project at a Glance

Begin Date
TBD

Cost
$4.5 million

Locality
Loudoun

District
Northern Virginia

Contact
Gene Weldon, P.E.
Project Manager
703-259-2599
Jim Zeller, P.E.
Preliminary Engineering Manager for Loudoun County
703-259-3220

About the Project

This project will improve the roadway alignment, increase shoulder and lane width, add guardrail and improve roadside drainage on Gum Spring Road (Route 659) between Cedar Ridge Boulevard (Route 2738) and Sweetwater Lane (a distance of about 1 mile) in Loudoun County.

Estimated cost

Preliminary engineering: $650,000
Right of way: $1.6 million    
Construction: $2.3 million
Total: $4.5 million

UPC: 93568  State Project: 0659-053-965,P101,R201,M501
Federal Project: HSIP-5A01(033)