In Design: East Spring Street Widening in the Town of Herndon

SMART SCALE Dashboard

Cost and schedule ►

Public outreach ►

Project Area

This project will widen about a half-mile of Spring Street from four to six lanes from just west of Herndon Parkway to Fairfax County Parkway.

Other improvements include:

  • Additional turn lanes on East Spring Street and Herndon Parkway.
  • Improving sidewalks on both sides of East Spring Street.
  • Adding to northbound Herndon Parkway a sidewalk as well as a cycle track, which combines the user experience of a separated path with the on-street infrastructure of a conventional bike lane.
  • Replacing the sidewalk along southbound Herndon Parkway.

Within the project limits, Spring Street averages up to 36,000 vehicles a day and Herndon Parkway averages 18,000.

Estimated Costs
Preliminary Engineering - $1.2 million
Right of Way Acquisition and Utility Relocation - $4.1 million
Construction - $6.6 million
Total: $11.9 million

This project is being financed with federal and state funding, including Smart Scale funding.

Benefits 

This project aims to improves safety, operations and connectivity for drivers, bicyclists and pedestrians.

Major Milestones 

Public Information Meeting - November 2017
Design Public Hearing - March 2018 
Categorical Exclusion Available - June 2018
Approve Design - July 2018
Begin Right of Way Acquisition - Spring 2019
Begin Utility Relocation - Summer 2019
Begin Construction - Winter 2020/21

Resources

Contact Info:

Hamid Misaghian, P.E.
Location & Design

Andrew Beacher, P.E.
Preliminary Engineering

Other relevant links:

Categorical Exclusion - June 2018 (Ad)

Previous Meetings >>

Phase: In Design

UPC: 105521

State ID: U000-235-354, P101, R201, C501

Federal ID: STP-5A01 (749)

Long/Lat: 38.958891, -77.374283

Locality: Fairfax

Page last modified: April 26, 2019