Town of Dillwyn - Route 1001, 1004, 1007 Improvements |
| Design-Build project |
Project at a Glance
Begin Date
June 2009
Est Completion Date
July 1, 2010
Cost
$636.081.60
Lengths and Limits
Approximately 0.2 mile.
Contractor
Pearson Construction Inc. of Dillwyn, Va.
District
Lynchburg
June 2009
Est Completion Date
July 1, 2010
Cost
$636.081.60
Lengths and Limits
Approximately 0.2 mile.
Contractor
Pearson Construction Inc. of Dillwyn, Va.
District
Lynchburg
Contact
Brian Henschel, P.E.
(434) 947-6559
Project Details
The project is located in the Town of Dillwyn, Virginia. The purpose of the project is to improve drainage along Routes 1001, 1004, and 1007, improve the radii at these intersections, add curbing and sidewalk along these routes, improve the travel-way, and construct tie-ins to Route 15. The project length is approximately 0.2 mile.Update: June 12, 2009: The project is now in the preliminary design phase. Construction could start as early as Fall 2009.
Contacts
Brian Henschel, P.E., (434) 947-6559Page last modified: June 12, 2009