Project at a Glance

Begin Date
Advertisement in June 2016

Cost
$4.7 million

Locality
Sussex

District
Hampton Roads

Contact
Hampton Roads Public Affairs
757-925-1647

Project Summary

The purpose of this project is to replace the Rte. 603 Bridges over Blackwater River and rebuild the approach roadway sections damaged by construction activities.

The new bridges will be two structures, with one bridge span totaling 45 feet long and 28 feet wide, and another 6-span bridge totaling 270 feet long and 24 feet wide within the existing right way.