Project at a Glance

Begin Date
July 2017

Est Completion Date
May 2018

Cost
$9.3 million (SMART Scale)

Contractor
Branch Civil

Locality
Norfolk

District
Hampton Roads

Contact
VDOT Public Affairs
757-925-1660

Project Overview

This interchange is one of the highest volume interchanges in the region. The project will modify the off-ramp interfaces to Northampton Boulevard from I-64 and lengthen the acceleration lane from Northampton Boulevard to I-64 West.

The work includes widening the I-64 West exit ramp approach to Northampton Boulevard from two lanes to five lanes (two left turns, two right turns and the existing continuous flow lane will be maintained but tightened for a more integrated movement onto Northampton Boulevard). The traffic signal at Northampton will also be modified.

The I-64-East ramp to Northampton Boulevard will be realigned to a signalized “T” and the ramp merge onto Northampton will be removed.

The project will increase the off-ramp capacity and eliminating difficult arterial weaving movements on Northampton Boulevard will greatly improve operations and safety at this location.

News Releases

I-64/Northampton Boulevard Interchange Project Completed Six Weeks Ahead of Schedule

I-64 West On-ramp from Northampton Blvd to be Completed March 18

New Traffic Pattern on I-64 West Exit Ramp to Northampton Boulevard Starting March 8

I-64 / Northampton Boulevard Interchange Improvements Scheduled to Begin the Week of July 10

Project Updates

To receive project update emails, send a request to hamptonroadspublicinfo@VDOT.virginia.gov with "Subscribe to Northampton Project Updates" in the subject line.

Follow us on Twitter and Facebook for project updates.

Bristol area projects Salem area projects Staunton area projects Lynchburg area projects Culpeper area projects Richmond area projects Northern Virginia projects Fredericksburg area projects Hampton Roads projects
Page last modified: April 20, 2018