Cost
$5 million for Environmental and Preliminary Engineering

Contact
Hampton Roads Communications
757-925-1660

About the Project

In March 2013, the Hampton Roads 2034 Long-Range Transportation Plan was amended to include an environmental study for the improvement of the I-64 corridor from I-464 to I-664/264, including the replacement of the High Rise Bridge. The purpose of the environmental study is to develop alternative solutions to address insufficient transportation capacity and correct roadway and bridge deficiencies throughout the corridor.  

Current Status

The study is underway and VDOT anticipates publishing the Environmental Assessment this fall for public review and comment. 

 

Public Meeting Information

At the open forum meeting held on Wednesday, Sept. 18, 2013, project experts were on-site to answer questions about the study corridor which encompasses I-64 from the I-64/I-464 interchange to the I-64/I-264 interchange at Bowers Hill, and replacement of the existing High Rise Bridge over the southern branch of the Elizabeth River.