Map of construction project districts

Under Construction

I-64/I-264 Ramp Improvements Project

Norfolk / Virginia Beach

Area Maps

Click to view full-size map>

Project Photos

Project at a Glance

Begin Date
Fall 2016

Est Completion Date
October 2019

Cost
$158 million

Lengths and Limits
From I-64 at the Twin Bridges (over the Elizabeth River) to I-264 before the Newtown Road interchange

Locality
Norfolk and Virginia Beach

District
Hampton Roads

Contact
Office of Communications
757-925-2583

View the latest project updates and construction photos at www.i64i264improvements.org

The project area between I-64 west (bottom) and I-264 east/Newtown Road on Jan. 25, 2017.

Project History and Purpose

Under current conditions, heavy congestion exists from Interstate 64 West to Interstate 264 East at the I-64 / I-264 interchange.

To relieve this congestion and improve the traffic operations from I-64 West to I-264 East, a ramp widening and new system of collector-distributor (CD) roads will be built.

The addition of a CD road will affected the existing geometry and operation of the downstream interchanges at Newtown Road and Witchduck Road.

The Virginia Department of Transportation (VDOT) is managing construction of this project, with funding allocated by the Hampton Roads Transportation Accountability Commission, from the Hampton Roads Transportation Fund.

The construction contractor is Tutor Perini Corp. of New Rochelle, New York.

Description

The changes at the I-64 / I-264 Ramp Improvements Project include:

  • Adding a second exit lane on I-64 West and the widening of the ramp from I-64 West to I-264 East
  • Introducing a new two-lane C-D road from I-64 to the Newtown Road interchange,
  • A new two-lane flyover ramp from I-64 West tying into the existing I-264 East C-D road

The new C-D road will serve the Newtown Road interchange on the southern side of I-264.

The flyover ramp will allow motorists to utilize the existing eastbound C-D road to travel from I-64 West to I-264 East without conflicting with the movements to and from the I-264 / Newtown Road interchange.

Current Status

Construction began in Fall 2016.

The project was fully funded by the Hampton Roads Transportation Accountability Commission (HRTAC) through the Hampton Roads Transportation Fund (HRTF).

This is the first of two projects in the corridor.

The second one is the I-264 / Witchduck Road Interchange and Ramp Extension.