Map of construction project districts

Recently Completed

I-464/I-564/Terminal Boulevard Paving

Norfolk

Project at a Glance

Begin Date
November 2013

Cost
$2.7 million

District
Hampton Roads

Contact
Hampton Roads Communications
757-925-1647

Project Details

This project will improve the riding surface of the existing roadway by patching the deteriorated pavement of various sections of I-464, I-564 and Terminal Boulevard. More specifically, repairs will occur in the north-and south bound lanes of I-464 from mile posts 0.0 to 0.9, the East and West bound lanes of I-564 from mile posts 0.5 to 3.0, the East and West bound lanes of Terminal Boulevard from the exit loop of I-564 to Ruthven Road and the loops and ramps from I-564 to Gate 3 of Naval Station Norfolk The goal of this project is to preserve the pavement and protect the quality of existing roadways.

Current Status

VDOT Contractors finished work on I-464, and partially completed I-564, but because of the extent of deterioration of those two interstates, the project money was exhausted before completion. Final cost was $2.7 million. No work was performed on Terminal Boulevard, and there is additional patching needed on I-564. A new contract will be advertised by VDOT to complete I-564, and a new project is being established for Terminal Boulevard, including the section within the City of Norfolk.

Bristol area projects Salem area projects Staunton area projects Lynchburg area projects Culpeper area projects Richmond area projects Northern Virginia projects Fredericksburg area projects Hampton Roads projects
Page last modified: Dec. 3, 2014