The Virginia Department of Transportation (VDOT) will be performing emergency repairs to a portion of the eastbound Interstate 64 bridge over Armistead Avenue near LaSalle Avenue in Hampton. 

Two box beams will be replaced within the auxiliary ramp lane on the eastbound I-64 bridge, requiring the closure of the LaSalle Avenue on-ramp and auxiliary lane on I-64 east for the duration of repairs, as well as intermittent closures of Armistead Avenue in each direction.

Once the beams are replaced, the bridge deck within the ramp lane closure will be milled and overlaid.

Benefits 

The emergency repairs will increase safety by replacing the bridge box beams. 

Major Milestones 

Work is tentatively scheduled to begin February 2019 and is estimated to be completed by Memorial Day.

Starting March 5, 2019 through May 2019:

  • The I-64 east on-ramp from northbound LaSalle Avenue will be closed for the duration of the project.

Starting March 2019 through April 2019:

  • All eastbound lanes of Armistead Avenue at the I-64 overpass (between LaSalle Ave and YMCA Way) will be closed for up to 6 weeks for the bridge deck demolition and installation of new bridge beams.

April 2019 - May 2019:

  • All westbound lanes of Armistead Avenue at the I-64 overpass (between YMCA Way and the I-64 off-ramp before Thomas Street) will be closed for up to 6 weeks for bridge deck demolition and installation of new bridge beams.

Resources

Other relevant links:

Press Releases:

Long/Lat: 37.033936, -76.361081

Locality: Hampton

1 / 1
The work area along the closed auxiliary ramp lane on I-64 east over Armistead Avenue.

Page last modified: March 20, 2019