Map of construction project districts

In Design

Route 1 Bridge Replacement at South River

Project at a Glance

Begin Date
Preliminary Engineering: 2017

Cost
Estimated $2.6 million

Locality
Caroline

District
Fredericksburg

Contact
Annette Adams, District Structure and Bridge Engineer
540-899-4288
Kelly Hannon, VDOT Communications Manager
540-374-3344

Project Overview

Due to the condition of the existing bridge, this structure is scheduled to receive a full replacement. 

Preliminary engineering work to replace the bridge will begin in 2017, as funding is available. 

Bristol area projects Salem area projects Staunton area projects Lynchburg area projects Culpeper area projects Richmond area projects Northern Virginia projects Fredericksburg area projects Hampton Roads projects
Page last modified: June 6, 2014