Map of construction project districts

Recently Completed

I-95/Route 207/Route 652, Intersection Improvements at Carmel Church

Area Maps

Project at a Glance

Begin Date
Spring 2009

Est Completion Date
November 2011

Cost
$15.2 million

Lengths and Limits
Route 207/Route 652 intersection

Contractor
J.L. Kent and Sons, Inc.

Locality
Caroline

District
Fredericksburg

Contact

Greg Henion, Assistant District Administrator for Construction
540-899-4288

Kelly Hannon, Communications Manager
540-374-3344

What's Being Done

Unsafe conditions are being caused by the increasingly long backup of trucks exiting Interstate 95 onto Route 207.

This project will improve the traffic movement by relocating Route 652 to a point approximately 1000 feet east of the current location.

The proposed typical section generally reflects a rural collector design with two 12-foot lanes and 8-foot shoulders on Route 652.

Intersection improvements will include turn lanes and a new signal; dual left turn lanes are proposed from Route 207 to relocated north Route 652.

Pavement design will accommodate heavy truck traffic.

A location and design public hearing about this project was held on August 10, 2006. Click here for a copy of the informational brochure from that meeting.
 

 

 

 

 

 

 

 

 

 

 

 








 

Bristol area projects Salem area projects Staunton area projects Lynchburg area projects Culpeper area projects Richmond area projects Northern Virginia projects Fredericksburg area projects Hampton Roads projects
Page last modified: March 26, 2013