Project at a Glance

Cost
$6 million for design, right of way and construction (fully funded)

Locality
Washington

District
Bristol

Contact
Gene Holley, Project Manager

What's being done?

Improvements to the Interstate 81 interchange at Exit 7 in Bristol are anticipated to begin spring 2014.

The interchange improvement project includes right turn lanes on Old Airport Road for the northbound and southbound I-81 on-ramps; widening Old Airport Road approximately 12 feet under the I-81 bridges, providing space for two lanes southbound and northbound and a left turn lane on Old Airport Road; widening of the bridge over Beaver Creek to the west side creating better traffic flow from Linden Drive to the I-81 southbound on-ramp; and dual left turn lanes on the northbound I-81 off-ramp.

 

Bristol area projects Salem area projects Staunton area projects Lynchburg area projects Culpeper area projects Richmond area projects Northern Virginia projects Fredericksburg area projects Hampton Roads projects
Page last modified: Jan. 23, 2014