Highway work zones in the Staunton District

The following is a list of highway work that might affect traffic in the Staunton transportation district during the coming weeks. The Staunton district is comprised of 11 counties, Alleghany, Bath, Rockbridge, Augusta, Highland, Rockingham, Shenandoah, Frederick, Page, Warren and Clarke. Work scheduled is subject to change due to inclement weather and material supplies. Motorists are advised to watch for slow-moving tractors during mowing operations. Also, when traveling through a work zone, be alert to periodic changes in traffic patterns and lane closures.

(NEW) _ Indicates a new or revised entry since last week’s report.

ALLEGHANY COUNTY
Interstate 64
* Mile marker 0 to 41, eastbound and westbound – Debris removal. Monday to Friday, 7:30 a.m. to 3 p.m.
* Mile marker 18.5 to 24.5, westbound and eastbound – Median barrier construction installation project:
Mile marker 18.5 to 20, eastbound – Right lane and shoulder closure.
Mile marker 20 to 24.5, eastbound – Left lane closure.
Mile marker 24.5 to 18.5, westbound – Left lane closure.
Mile marker 23 to 20, westbound – Right shoulder closure.
Mile-marker 21 to 20, westbound – Right lane and shoulder closure. Be alert for traffic transitioning from the right lane to the left lane near mile marker 21, single lane traffic. Traffic is transitioned from left lane to right lane near mile marker 20.
Eastbound traffic will be in the travel lane until motorists clear the Island Ford Bridge, then traffic will transition into the left/passing lane.
The speed limit in the work zone is 45 mph.
Wide loads up to 12-feet in width can proceed eastbound and westbound through the work zone.
* Mile marker 25.6, eastbound and westbound – Bridge work on bridges over Commercial Avenue and Smith Creek. Possible single-lane traffic, Monday to Friday, 7 a.m. to 5 p.m.

 

Primary Roads
* Route F-205 (Irvine Farm Road) – Flagging operations for I-64 median barrier project work.
* Various routes – Shoulder repairs, Monday to Friday, 8:30 a.m. to 4 p.m.

Secondary Roads
* Route 616 (Rich Patch Road) – Box culvert replacement at Karnes Creek. Estimated completion of box culvert backfill is Dec. 14. Roadway will reopen to two-way traffic when backfill operations are complete. Paving to begin within two weeks followed by guardrail installation, weather permitting. The 10-foot roadway width restriction will be lifted. Work zone will be active on weekdays from 7 a.m. to 5 p.m. with signs and flaggers as needed. Motorists should use extreme caution in this area and watch for construction vehicles.
* Route 1011 – Bridge replacement in Selma area between Route 1002 and Route 1003. Road will be closed Monday to Thursday. Detour signs in place.
* Route 1101 (Winterberry Avenue) – Flagging operations for I-64 median barrier project work.
* Various routes – Ditching in Potts Creek area. Flagger traffic control, Monday to Friday, 8:30 a.m. to 4 p.m.
* Various roads – Brush cutting, shoulder repairs and pipe installation. Flagger traffic control, Monday to Friday, 8:30 a.m. to 4 p.m.

BATH COUNTY
Primary Roads
* Route 220, southbound – Pipe replacement. Flagger traffic control, Monday to Friday, 8:30 a.m. to 4 p.m.

Secondary Roads
* Various roads – Pothole repair and grading. Flagger traffic control, Monday to Friday, 8:30 a.m. to 4 p.m.

ROCKBRIDGE COUNTY
Interstate 64
* Mile marker 41 to 56, eastbound and westbound – Debris removal, Monday to Friday, 7:30 a.m. to 3 p.m.

Interstate 81
* Mile marker 173 to 205, northbound and southbound – Debris removal, Monday to Friday, 7:30 a.m. to 3 p.m.
* (UPDATE) Blasting will occur on Dec. 14, Dec. 15 and Dec. 16 at 1:30 p.m. The blasting locations will be on I-81 between mile-markers 197 to 200. Signs are posted in this area. Both northbound and southbound lanes will have a rolling mobile lane closure. Nighttime right northbound lane closure will take place from mile marker 197 to 198 on Dec. 13 from 8 p.m. to 7 a.m. Nighttime single-lane closures will take place from mile marker 200 to 201 northbound, Dec. 16, 8 p.m. to 7 a.m.

Primary Roads
* Route 11 – Bridge work on bridge over Buffalo Creek from 0.20 mile north of Route 678 to 0.82 mile south of Route 843. Possible single-lane traffic, weekdays, 7 a.m. to 5 p.m.
* Route 11 – Shoulder repair. Flagger traffic control, Monday to Friday, 8:30 a.m. to 4 p.m.
* Route 60 – Shoulder repair. Flagger traffic control, Monday to Friday, 8:30 a.m. to 4 p.m.

Secondary Roads
* (UPDATE) Route 716 – Setting structural steel. Road closed, Dec. 14, Dec. 15 and Dec. 16, 8 a.m. to 5 p.m. Schedule will be adjusted for school bus traffic to use Route 716 and not the detour. Suggested detour: Take Route 11 north past Route 716. At Route 712 take a left onto Route 712. Continue on Route 712 and take a left onto Route 717. Follow Route 717 to Route 716.
* Various roads – Brush cutting, mowing, grading, shoulder repair, litter removal and pothole repair. Flagger traffic control, Monday to Friday, 8:30 a.m. to 4 p.m.

HIGHLAND COUNTY
Primary Roads
* Route 250 – Pipe cleaning.

Secondary Roads
* Route 624 – Brush cutting. Flagger traffic control, Monday to Friday, 8:30 a.m. to 4 p.m.
* Route 654 – Brush cutting. Flagger traffic control, Monday to Friday, 8:30 a.m. to 4 p.m.
* Various routes – Stone application. Flagger traffic control, Monday to Friday, 8:30 a.m. to 4 p.m.

AUGUSTA COUNTY
Interstate 64
* Mile marker 91.2, westbound – Guardrail work. Right shoulder closed, weekdays.
* Mile marker 96.6, westbound – Guardrail work. Right shoulder closed, weekdays.

Interstate 81
No lane closures reported.

Primary Roads
* Route 42 – Mossy Creek project. Roadway relocation and bridge replacement with box culvert. Work will occur from 0.63 mile south of Rockingham County line to 0.90 mile south of Rockingham County line. Two lanes of roadway will be maintained. Completion is July 20, 2011.
* Route 340 (Stuarts Draft Highway) – Traffic signal reconstruction at Route 608 (Tinkling Spring Road/Draft Avenue). Intermittent lanes closures, Monday to Thursday 7 a.m. to 5:30 p.m. Estimate completion is January 21, 2011.
* Route 340 (Stuarts Draft Highway) – Traffic signal reconstruction at Route 649 (Augusta Farm Road/Locust Grove Lane). Intermittent lanes closures, Monday to Thursday 7 a.m. to 5:30 p.m. Estimate completion is January 21, 2011.
* (NEW) Various roads – Pipe installation, patching, brush cutting, shoulder repairs, ditching and grading. Monday to Friday, 7 a.m. to 3:30 p.m.

Secondary Roads
* Route 746 – Road reconstruction with flaggers controlling traffic from Route 745 to Route 616.
* Route 906 – Rural rustic project from Route 612 (Indian Ridge Road) to Route 11 (Lee Jackson Highway). Expect delays Monday to Friday, 7 a.m. to 5 p.m. Traffic will be controlled with flaggers during work hours. Estimated completion is May 31, 2011.
* Route 971 (Lipscomb Road) – Bridge superstructure replacement on South River Bridge, 0.50 mile north of intersection of Route 624 and Route 970. Road closed. Detour signs posted. Estimated completion is January 14, 2011.
* (NEW) Various roads – Pipe installation, patching, brush cutting, shoulder repairs, ditching and grading. Monday to Friday, 7 a.m. to 3:30 p.m.

ROCKINGHAM COUNTY
Interstate 81
* Mile marker 237.51 to 263.9, northbound and southbound – Debris removal, drain cleaning and guardrail work. Monday to Friday, 9 a.m. to 4 p.m.

Primary Roads
* Stone Spring Road – Erickson Avenue/Stone Spring Road Connector Project from the Route 11 intersection to the Port Republic Road intersection. Lane and shoulder closures, daily, 8 a.m. to 5 p.m. Estimated completion is spring 2013.
* Route 253 (Port Republic Road) – Road widening project from Route 704 (Boyers Road) to Harrisonburg City limits. Motorists should be alert for a traffic pattern change on Oct. 7. Southbound traffic at the Harrisonburg city limits will be shifted to the right onto the newly constructed roadway. Just before the Southeast Connector intersection, traffic will be moved to the left and rejoin the existing roadway. Northbound traffic, just past the Southeast Connector, will shift to the left. Prior to entering the Harrisonburg city limits, traffic will be guided to the right and return to the existing roadway. All work is subject to change and weather permitting.

Secondary Roads
* Route 624 (Mill Lane) – Bridge superstructure replacement on Elk Run Bridge from 1.80 miles north of Route 33 (Spotswood Trail) to Route 623 (Mount Pleasant Road). Road closed beginning Nov. 10. Suggested detour: Motorists wishing to access Route 624 south of the bridge should use the Route 33 intersection with Route 624. Motorists wishing to access Route 624 north of the bridge should use the Route 33 intersection with Route 634 (Tanyard Bridge Road) and follow the posted detour signs to the intersection of Route 623 to Route 624. Estimated completion is January 10, 2011.
* Route 671 (Shady Grove Road) – Mill Creek Bridge will be closed for bridge work. This location is near Port Republic. A detour will be posted. Motorists wishing to access Route 671 west of the bridge should take Route 253 (Port Republic Road) to Route 672 (Latimer Road) to Route 671. East of the bridge motorists can use Route 253 to Route 670 (Doe Hill Road) to Route 671
* Route 722 (Armentrout Path) – Mountain Run Bridge will be closed for bridge work. This location is at the Route 868 (Airey Lane) intersection near the Brethren Woods Camp in the George Washington National Forest, north of Keezletown. Estimated completion is Dec. 17.
* Route 726 (Erickson Avenue) – Road work at the intersection of Route 33 (Rawley Pike). Intermittent lane closures with flaggers controlling traffic, Monday to Friday, 8 a.m. to 5 p.m.
* Route 800 (Long Meadow Drive) – Columbia Gas work from Route 800 (Lone Pine Road) to Route 619 (Wampler Road). Monday to Friday, 8 a.m. to 5 p.m. intermittent lane and shoulder closure with flagger traffic control.
* Route 800 (American Legion Drive) – Columbia Gas work from Route 801 (Holsinger Road) to end of state maintenance. Monday to Friday, 8 a.m. to 5 p.m. intermittent lane and shoulder closure with flagger traffic control.
* Route 801 (Holsinger Road) – Columbia Gas work from Route 800 (American Legion Drive) to Route 619 (Wampler Road). Monday to Friday, 8 a.m. to 5 p.m. intermittent lane and shoulder closure with flagger traffic control.
* Route 820 (Bergton Road) – Slope and shoulder repair from 0.02 to 1.5 miles west of Route 259 (Brocks Gap Road). Flagger traffic control, Monday to Friday, 7 a.m. to 5 p.m. Estimated completion is January 2011.
* Route 890 (Buckley Road) – Columbia Gas work from Route 619 (Piney Woods Road) to end of state maintenance. Monday to Friday, 8 a.m. to 5 p.m. intermittent lane and shoulder closure with flagger traffic control.

PAGE COUNTY
Primary Road
* Route 340 – Bridge work on bridge over South Fork Shenandoah River from 0.01 mile north of Route 650 to 0.10 mile south of Route 613. Single-lane traffic, weekdays, 7 a.m. to 5 p.m.
* Various roads – Pipe installation, patching, brush cutting, shoulder repairs, ditching and grading. Monday to Friday, 7 a.m. to 3:30 p.m.

Secondary Roads
* Various roads – Pipe installation, patching, brush cutting, shoulder repairs, ditching and grading. Monday to Friday, 7 a.m. to 3:30 p.m.

SHENANDOAH COUNTY
Interstate 81
* Mile marker 263.9 to 298, northbound and southbound – Debris removal, drain cleaning and guardrail work. Monday to Friday, 9 a.m. to 4 p.m.
* (NEW) Mile marker 269.1, northbound and southbound – Bridge work on bridge over North Fork Shenandoah River. Possible single-lane closure, Monday night to Thursday morning, 8 p.m. to 7 a.m.

Primary Roads
* Various routes – Mowing.

Secondary Roads
* Route 609 (South Hollingsworth Road) – Swinging bridge is closed until further notice. This location is 0.20 mile east of Route 670 (East Reservoir Road). Signs and barricades will be located, closing bridge to all pedestrian traffic.
* Route 744 (Deer Rapids) – Bridge over Shenandoah River. Bridge work from 0.30-mile east of Route 648 to 0.45-mile east of Route 648. Traffic controlled by flaggers as needed during daylight hours, Monday to Friday. Estimated completion is April 14, 2011.
* Various routes – Pipe cleaning, scraping and ditch work.

FREDERICK COUNTY
Interstate 81
* Mile marker 300 to 324, northbound and southbound – Debris removal, drain cleaning and guardrail work. Monday to Friday, 9 a.m. to 4 p.m.

Primary Roads
* Route 50 – Shoulder work in Stephens City area.
* Route 522 – Intersection improvement at Route 642 (Tasker Road) including additional turn lane and signal installations. Lane closures and lane shifts during construction. Work is Monday to Friday, 7 a.m. to 5 p.m. Estimated completion is spring 2011.

Secondary Roads
* (NEW) Various routes – Brush cutting and patching.

CLARKE COUNTY
Primary Roads
No lane closures reported.

Secondary Roads
No lane closures reported.

WARREN COUNTY
Interstate 66
* Mile marker 0 to 13, eastbound and westbound – Debris removal and guardrail work, Monday to Friday, 9 a.m. to 4 p.m.
* Mile marker 6 to 15, eastbound and westbound – Bridge work on various structures. Possible single-lane traffic, Monday to Thursday, 8 a.m. to 3 p.m.

* Mile marker 10.2, eastbound – Slide repair. Shoulder closed, Monday to Friday, 7 a.m. to 5 p.m.

Interstate 81
* Mile marker 298 to 300, northbound and southbound – Debris removal, Monday to Friday, 9 a.m. to 4 p.m.

Primary Roads
No lane closures reported.

Secondary Roads
* Route 1026 (Happy Creek Road) Front Royal area – Road improvement project from Sixth Street and Bradford Drive to near Route 606 (Shenandoah Shores Road). Temporary lane closures 7 a.m. to 5 p.m., Monday to Friday. Happy Creek Road closed from Polk Avenue to Sixth Street until Nov. 30 to reconstruct the Sixth Street intersection. Motorists should follow detour signs for alternate route. The speed limit in this work zone will be reduced to 25 mph.

Vegetation management may occur district wide on various routes.

Motorists are reminded to use extreme caution when traveling through work zones.

Traffic alerts and traveler information can be obtained by dialing 511. Traffic alerts and traveler information also are available at 511Virginia.org. For other assistance call the VDOT Customer Service Center, available 24 hours-a-day, seven days a week. Citizens can dial 1-800-FOR-ROAD (1-800-367-7623) from anywhere in the state to report road hazards, ask transportation questions, or get information related to Virginia’s roads.

VDOT can be followed on Facebook, Flickr, Twitter and YouTube. RSS feeds are also available for statewide information. The VDOT Web page is located at www.VirginiaDOT.org.

Highway safety is everyone’s responsibility. Virginia’s highway safety partnership — the Virginia Department of Transportation, Virginia Department of Motor Vehicles and Virginia State Police — challenges you to help prevent highway fatalities. Buckle up. Avoid distractions. Share the road. Drive drug- and alcohol-free. Obey speed limits. For more information on the Highway Safety Challenge and things you can do to avoid becoming Virginia’s next traffic fatality, visit www.safeVAhighways.org.



Information in VDOT news releases was accurate at the time the release was published. For the most current information about projects or programs, please visit the project or program Web pages. You may find those by searching by keyword in the search Virginia DOT box above.

Page last modified: Oct. 17, 2012