RELEASE:

CONTACT:
IMMEDIATE

Sandy Myers 540-332-9201
Sandy.Myers@vdot.virginia.gov
540-292-2500 (cell)
Ken Slack 540-332-9264
Ken.Slack@vdot.virginia.gov
540-414-5670 (cell)
STA09-152

July 17, 2009



TRAFFIC ALERT FOR WEEK OF JULY 20 – 24, 2009
Highway work zones in the Staunton District

The following is a list of highway work that might affect traffic in the Staunton transportation district during the coming weeks. The Staunton district is comprised of 11 counties, Alleghany, Bath, Rockbridge, Augusta, Highland, Rockingham, Shenandoah, Frederick, Page, Warren and Clarke. Work scheduled is subject to change due to inclement weather and material supplies. Motorists are advised to watch for slow-moving tractors during mowing operations. Also, when traveling through a work zone, be alert to periodic changes in traffic patterns and lane closures.

(NEW) _ Indicates a new or revised entry since last week’s report.

ALLEGHANY COUNTY
Interstate 64
* Mile marker 0 to 57, eastbound and westbound – Mowing, litter and debris removal. Monday to Friday, 7 a.m. to 7 p.m.
* Various locations – Trimming around signs. Monday to Friday, 7 a.m. to 3:30 p.m.

Primary Roads
No lane closures reported.

Secondary Roads
* Various roads – Shoulder repair, patching. Monday to Thursday, 7 a.m. to 5:30 p.m. Single-lane traffic, flagger traffic control.


BATH COUNTY
Primary Roads
No lane closures reported.

Secondary Roads
* Route 609 – Patching, Monday to Thursday, 7 a.m. to 5:30 p.m. Single-lane traffic, flagger traffic control.
* (NEW) Route 625 – Patching, Monday to Thursday, 7 a.m. to 5:30 p.m. Single-lane traffic, flagger traffic control.
* (NEW) Various roads – Ditching, Monday to Thursday, 7 a.m. to 5:30 p.m. Single-lane traffic, flagger traffic control.


ROCKBRIDGE COUNTY
Interstate 64
* Mile marker 41 to 57, eastbound and westbound – Paved ditch cleaning, trimming around signs, litter and debris removal. Monday to Friday, 7 a.m. to 3:30 p.m.

Interstate 81
* Mile marker 173 to 237, northbound and southbound – Paved ditch cleaning, trimming around signs, herbicidal spraying bridges and ditches, litter and debris removal. Monday to Friday, 7 a.m. to 4 p.m.
* Mile marker 194 to 198, northbound and southbound – Bridge deck maintenance. Possible single-lane traffic, Monday night to Friday morning, 8 p.m. to 7 a.m.
* Mile marker 195, northbound and southbound – Roadway lighting construction. Work will resume with power supply connection from power company.
* Mile marker 200, northbound and southbound – Roadway lighting construction. Work will resume with power supply connection from power company.

Primary Roads
* Route 11 – Roadway lighting construction. Work will resume with power supply connection from power company.
* Route 130 (Glasgow) – Bridge construction at Route 501. Periodic single-lane traffic with flagger traffic control, Monday to Thursday, 7 a.m. to 5:30 p.m. and Friday, 7 a.m. to noon. Completion is in September 13, 2010.

Secondary Roads
* Route 710 – Roadway lighting construction. Work will resume with power supply connection from power company.
* Various roads – Brush cutting, pipe replacement, patching. Monday to Thursday, 7 a.m. to 5:30 p.m. Single-lane traffic, flagger traffic control.
* Various roads – Grading, mowing. Monday to Thursday, 7 a.m. to 5:30 p.m.


AUGUSTA COUNTY
Interstate 64
No lane closures reported.

Interstate 81
* Mile marker 173 to 237, northbound and southbound – Paved ditch cleaning, herbicidal spraying bridges and ditches, litter and debris removal. Monday to Friday, 7 a.m. to 4 p.m.
* Mile marker 205 to 207, northbound – Paving. Alternating lane closures, Tuesday night to Friday morning, 7 p.m. to 7 a.m. Message boards, signs posted.
* Mile marker 210 to 229, northbound and southbound – Bridge deck maintenance. Possible single-lane traffic, Monday night to Friday morning, 8 p.m. to 7 a.m.

Primary Roads
* (NEW) Route 11, southbound – Paving from north of Rockbridge County line to Route 667 (Dabneys Road). Single-lane traffic, flagger traffic control, Monday, 7 a.m. to 7 p.m.
* Route 11, southbound (Lee Jackson Highway) – Pavement marking from Route 694 to Route 701. Possible lane shift with flagger traffic control, Monday to Friday, 8:30 a.m. to 4:30 p.m.
* Route 250, westbound – Paving from Route 637 to Route 1427. Expect minor delays.
* (NEW) Route 276 – Sidewalk repair from Route 256 to Town of Weyers Cave. Right shoulder closed Monday and Tuesday.
* Route 340 (Waynesboro) – Construction from Route 250 to Delphine Avenue for railroad bridge replacement and roadway widening, Monday to Friday, 7 a.m. to 5:30 p.m. Expect minor delays from Broad Street to Sixth Street for construction work. Seventh Street closed from Winchester Avenue to Delphine Avenue, June 1 to Jan. 2010, and Sixth Street closed from Delphine Avenue to Commerce Street, July 6 to Jan. 2010, for retaining wall construction, bridge and utility work. Estimated completion is Nov. 2011.
* Various roads – Debris cleanup.

Secondary Roads
* (NEW) Route 608 – Shoulder reconditioning from Route 652 to Route 898. Flagger traffic control, Wednesday to Friday.
* (NEW) Route 616 – Mowing, Monday to Friday. Mobile operation.
* (NEW) Route 646 – Shoulder work from Route 11 to Route 42. Traffic control, Monday to Thursday.
* Route 686 (Hill Top Drive), northbound and southbound – Rural rustic from Route 694 (Swartzel Shop Road) to end of state maintenance. Road closed to thru traffic, Monday to Friday, 7 a.m. to 3:30 p.m. Signs posted. Estimated completion is July 31.
* (NEW) Route 699 – Shoulder work from Rockingham County line to Route 699. Traffic control, Wednesday to Friday.
* (NEW) Route 741 (Old Quarry Road), eastbound and westbound – Bridge work from Route 607 (Mount Solon Road), eastbound and westbound to Route 739 (Moffett Branch Road), eastbound and westbound. Road closed from 8 a.m., Wednesday, to 5 p.m. Thursday.
* Route 774, northbound and southbound (Cline River Road, New Hope) – Bridge over Middle River. Bridge replacement activities from Route 608 (Battlefield Road) to Route 775 (Craig Shop Road). Road closed from Mar. 30 to Nov. 13. Suggested detour: Northbound traffic take Route 608 to Route 778 (Knightly Mill Road) to Route 775 to Route 774. Southbound traffic take reverse of northbound detour.
* Route 794 (Sangers Lane), eastbound and westbound – Bridge over Christians Creek, from Route 792 (Basley Road) to Route 642 (Barren Ridge Road). Bridge replacement. Road closed, 24 hours-a-day, seven days-a-week, April 27 to Dec. 16. Suggested detour: Westbound traffic, take Route 792 south to Route 250 (Jefferson Highway) east to Route 642 north to Route 794. Eastbound traffic, take reverse of westbound detour.
* Route 835 – Tree cutting from Route 728 to Route 736, Monday to Friday. Signs posted.
* (NEW) Various roads (Westview) – Mowing, Monday to Friday.
* Various roads – Surface treatment. Expect minor delays.
* Various roads – Machining dirt roads, patching. Monday to Friday. Mobile operation.


HIGHLAND COUNTY
Primary Roads
* (NEW) Route 84 – Mowing from Route 220 (Mill Gap Road) to West Virginia State line.
* (NEW) Route 220 (Potomac River) – Patching, Thursday to Friday from north of Monterey City limits to West Virginia State line. Single-lane traffic, flagger traffic control.
* (NEW) Route 250 – Bridge widening from 0.60 mile east of Route 678. Single-lane traffic, temporarily controlled by flaggers, then controlled by portable traffic signals with concrete barrier. Lane width restrictions are 10-feet wide.
* (NEW) Route 250 – Patching from Route 600 (Mountain Turnpike) to West Virginia State line, Monday to Wednesday. Single-lane traffic, flagger traffic control.
* Route 250 – Brush removal from McDowell County line to Augusta County line.
* Route 250 – Patching from 4 miles west of McDowell County line to 2 miles east of Monterey City limits.

Secondary Roads
* (NEW) Route 678 – Brush removal.
* Route 678 – Ditching from Route 615 to Route 609.
* Various roads – Pothole patching, mobile operation.


ROCKINGHAM COUNTY
Interstate 81
* Mile marker 237 to 263, northbound and southbound – Sign repair, litter and debris removal. Monday to Friday, 9 a.m. to 4 p.m.
* Mile marker 247, southbound – Safety upgrade at I-81 and Route 33 interchange. Lane closures, Monday to Thursday, 8 p.m. to 7 a.m. Shoulder closures, 24 hours-a-day, seven days-a-week. Estimated completion is Aug.15.

Primary Roads
* Route 211 (New Market Road) – Cable installation from Route 960 (Water Wheel Road) to Shenandoah City limits. Right shoulder closure, Monday to Friday, 8 a.m. to 5 p.m.
* Route 253 (Port Republic Road) – Sewer line installation from Route 704 (Osceola Springs Road) to Route 276 (Cross Keys Road). Westbound lane shoulder closure. Occasional single-lane traffic with flagger traffic control. Monday to Friday, 7 a.m. to 5 p.m.
* Route 259 (Brocks Gap Road) – Directional bore from Route 820 (Bergton Road) to West Virginia State line. Right shoulder closure, Monday to Friday, 8 a.m. to 5 p.m.

Secondary Roads
* (NEW) Route 613 (Singers Glen Road) – Singers Glen 5k Race. Road closed from Route 777 (Peter Driver Lane) to Route 780 (Frog Hollow Road), Saturday, 8 a.m. to 10 a.m.
* Route 641 (Cave Hill Road) – Road work from Route 843 (Cemetery Road) to Route 991 (Jacob Burner Road). Intermittent lane closures. Flagger traffic control. Monday to Friday, 7 a.m. to 5 p.m.
* Route 646 (Bloomer Springs Road) – Road work at Route 644 (Resort Drive). Intermittent lane closures with flagger traffic control, Monday to Friday, 8 a.m. to 5 p.m.
* Route 709 (Autumn Lane) – Sewer line installation from Route 704 (Osceola Springs Road) to Route 710 (Greendale Road). Westbound shoulder closure. Occasional single-lane traffic with flagger traffic control. Monday to Friday, 7 a.m. to 5 p.m.
* Route 820 (Crab Run Road) – Aerial line installation from Route 865 (Bergton Road) to West Virginia State line. Right shoulder closure, Monday to Friday, 8 a.m. to 5 p.m.
* Route 826 (Criders Road) – Aerial line installation from Route 820 (Bergton Road) to Route 700 (Trailer Park Road). Right shoulder closure, Monday to Friday, 8 a.m. to 5 p.m.
* Route 843 (Cemetery Road) – Road work at Route 641 (Cave Hill Road) and Route 650 (Power Dam Road). Intermittent single-lane traffic, flagger traffic control. Monday to Friday, 7 a.m. to 5 p.m.
* Route 865 (Bergton Road) – Aerial line installation from Route 820 (Bergton Road) to Route 823 (Overly Hollow). Right shoulder closure, Monday to Friday, 8 a.m. to 5 p.m.
* Route 867 (North River Road) – Construction entrance from Route 11 (Main Street) to Route 693 (Fairview Road). Right shoulder closure, Monday to Friday, 7 a.m. to 5 p.m.
* Route 914 (Majestic View Road) – Slope and ditch work from Route 732 (Bank Church Road) to Route 734 (Coakley Town Road). Monday to Friday, 8 a.m. to 5 p.m. Single-lane traffic, flagger traffic control.
* Route 981 (Rockingham Pike) – Sewer and drainage work from Route 33 to Route 829 (Independent Road). Right shoulder closure, Monday to Friday, 8 a.m. to 5 p.m.
* Route 996 (McGaheysville Road) – Sewer line installation from Route 651 (Power Dam Road to Route 842 (Slate Road). Single-lane traffic, flagger traffic control, Monday to Friday, 7 a.m. to 5 p.m.
* (NEW) Route 1330, northbound and southbound – Plant mix application. Single-lane traffic, Monday, 7 a.m. to 9 p.m.
* (NEW) Route 1331 northbound and southbound – Plant mix application. Single-lane traffic, Monday, 7 a.m. to 9 p.m.
* Various roads – Surface treatment. Single-lane traffic, pilot truck. Monday to Friday, 6 a.m. to 6 p.m.


SHENANDOAH COUNTY
Interstate 81
* Mile marker 263 to 298, northbound and southbound – Shoulder repair, sign and fence repair, brush cutting, litter and debris removal. Monday to Friday, 9 a.m. to 4 p.m.
* Mile marker 279C, southbound – Bridge over Stoney Creek. Bridge repairs. Ramp narrowed 24 hours-a-day, seven days-a-week.

Primary Roads
No lane closures reported.

Secondary Roads
* Route T1003 (Cadet Road, New Market) – Bore work from Route 211, westbound to Route 1009 (Stuart Street). One-way traffic. Estimated completion is mid-August 2009.
* Various roads – Tightening and resurfacing timber bridge decks, patching, brush cutting, pipe replacement.


FREDERICK COUNTY
Interstate 81
* Mile marker 300 to 324, northbound and southbound – Sign repair, litter and debris removal. Monday to Friday, 9 a.m. to 4 p.m.

Primary Roads
* (NEW) Route 11 (Winchester) – Repair drainage, mowing.
* Route 522 (Winchester) – Bridge sweeping.
* Papermill Road (Winchester) – Road reconstruction from .06 mile south of Weems Lane to .28 mile north of South Pleasant Valley. Suggested alternate route: Weems Lane to Roosevelt Boulevard to Papermill Road. Monday to Saturday, from 8 a.m. to 5 p.m.
* Various roads – Line painting, Monday to Friday, 7 a.m. to 7 p.m. Mobile operation.

Secondary Roads
* (NEW) Route 668 (Branson Spring Road) – Railroad crossing replacement work from 0.2 mile east of Martinsburg Pike (Route 11) to 0.25 mile east of Martinsburg Pike. Road closed 7 a.m., Tuesday to 9 p.m. Thursday. Suggested detour: Westbound on Route 668, take 671 (Woodside Road), westbound to Martinsburg Pike. Eastbound on Route 668, take Martinsburg Pike to Route 671, eastbound to Route 668.
* Route 679 (Indian Hollow Road) – Rural rustic from 0.3 miles west of Route 608 to 1.5 miles west of Route 608. Possible delays. Estimated completion is early August.
* Various roads – Line painting, Monday to Friday, 7 a.m. to 7 p.m. Mobile operation.
* Various roads – Tightening and resurfacing timber bridge decks, patching, pipe repair.


PAGE COUNTY
Primary Roads
* Route 340 (Jeremy’s Run) – Bridge work. Work hours will be from 8 a.m. to 4:30 p.m., Monday to Friday. Flagger traffic control. Traffic has been rerouted to new bridge and approaches. Expect delays and use extreme caution while traveling through the work zone. The speed limit will remain 45 miles per hour throughout the project limits.
* Route 340 – Asphalt placement from 0.2 miles north of Route 684 to Route 661. Lane closures with flagger traffic control, Monday to Friday, 7 a.m. to 7 p.m.

Secondary Roads
* Route 607 – Asphalt placement from Route 759 to 1.7 miles north of Route 759. Lane closures with flagger traffic control, Monday to Friday, 7 a.m. to 7 p.m.
* Route 639 – Asphalt placement from Route 340 to Route 616. Lane closures with flagger traffic control, Monday to Friday, 7 a.m. to 7 p.m.
* Route 662 – Jeremy’s Run bridge construction with Route 340 intersection. Periodic lane closures Monday to Friday, 8 a.m. to 4:30 p.m., flagger traffic control.
* Route 699 (Jeremy’s Run bridge construction) – Periodic lane closures Monday to Friday, 8 a.m. to 4:30 p.m. with flagger traffic control.
* Route 700 (Jeremy’s Run bridge construction) – Relocation of Route 700 intersection with Route 340. Use extreme caution as motorists become acquainted with new traffic pattern. Periodic lane closures Monday to Friday, 8 a.m. to 4:30 p.m., with flagger traffic control.
* Various roads – Patching and grading stabilized routes, Monday to Friday.


WARREN COUNTY
Interstate 66
* (NEW) Mile marker 0, westbound – Bridge over I-66 eastbound ramp and I 81 northbound lane. Bridge deck maintenance. Ramp narrowed, Monday to Friday, 7 a.m. to 3 p.m.
* Mile marker 0 to 13, eastbound and westbound – Shoulder repair, sign repair, litter and debris removal. Monday to Friday, 9 a.m. to 4 p.m.

Primary Roads
* Route 340/522 (Winchester Road) – Traffic signal upgrade at the I-66 eastbound and westbound ramps. Motorists are urged to drive with caution in the work zone.
* Route 340/522 (North Fork Bridge project) – Bridge construction west of Route 340/522 to new North Fork bridge. Speed limit reduced to 25 mph. Road construction with possible lane closures, Monday to Friday, 9 a.m. to 3 p.m. on Route 340/522 from Guard Hill Road to Route 55. Motorists should expect delays and use extreme caution when traveling in the work zone.

Secondary Roads
* Route 609 (Ritenhour Hollow Road) – Partially collapsed pipe overflow, from Route 627 (Reliance Road) to Route 736 (Molly Campbell Lane). Road closed for undetermined amount of time. Motorists are encouraged to use alternate routes.
* Route 721 (Fellows Drive) – Road reconstruction from Route 638 (Howellsville Road) to Young’s Drive. Periodic single-lane traffic, flagger traffic control. Monday to Friday, 7 a.m. to 5 p.m.
* Various roads – Ditching and grading stabilized routes, Monday to Friday.

CLARKE COUNTY
Primary Roads
* (NEW) Route 7, eastbound and westbound – Bridges over Shenandoah River from 0.05 mile west of Route 606. Bridge deck maintenance. Possible single-lane traffic, flagger traffic control. Monday to Friday, 9 a.m. to 7 p.m. for eastbound structure and 7 a.m. to 3 p.m. for westbound structure.

Secondary Roads
* Various roads – Patching, asphalt leveling, grading stabilized routes. Monday to Friday.

Vegetation management may occur district wide on various routes.

Motorists are reminded to use extreme caution when traveling through work zones. Traffic alerts and traveler information can be obtained by dialing 511. In areas where 511 is unavailable, dial 1-866-MY511VA (866-695-1182) (TTY/TDD users, call 711). Traffic alerts and traveler information also are available at 511Virginia.org.

Highway safety is everyone’s responsibility. Virginia’s highway safety partnership — the Virginia Department of Transportation, Virginia Department of Motor Vehicles and Virginia State Police — challenges you to help prevent highway fatalities. Buckle up. Avoid distractions.
Share the road. Drive drug- and alcohol-free. Obey speed limits. For more information on the Highway Safety Challenge and things you can do to avoid becoming Virginia’s next traffic fatality, visit www.safeVAhighways.org.



Information in VDOT news releases was accurate at the time the release was published. For the most current information about projects or programs, please visit the project or program Web pages. You may find those by searching by keyword in the search Virginia DOT box above.

Page last modified: Oct. 17, 2012