RELEASE:

CONTACT:
IMMEDIATE

Mike Murphy 703-259-1757
703-638-8547 michael.murphy@vdot.virginia.gov
NR16-104

Aug. 24, 2016



FLEETWOOD ROAD REOPENS
New paved surface from Revival Drive to south of Evergreen Mills Road

ALDIE – Fleetwood Road has reopened to through traffic, according to the Virginia Department of Transportation.

The road was closed to through traffic from June 1 until this evening in order to replace about two miles of gravel surface with pavement, from Revival Drive to just south of Evergreen Mills Road. In addition, the ditches were restored along this stretch of Fleetwood.

The project was carried out under VDOT’s Rural Rustic Road Program, which aims to preserve the traditional feel of a rural road while making surface and other improvements within the current right-of-way.

The northern end of the new pavement, located about a quarter-mile south of Evergreen Mills Road, is planned to connect to Langley Oaks Drive in the near future.

Follow VDOT Northern Virginia on Twitter: @vadotnova

END



Information in VDOT news releases was accurate at the time the release was published. For the most current information about projects or programs, please visit the project or program Web pages. You may find those by searching by keyword in the search Virginia DOT box above.

Page last modified: Aug. 24, 2016