RELEASE:

CONTACT:
IMMEDIATE

Jenni McCord 703-259-1779
571-230-2926 Jennifer.McCord@vdot.virginia.gov
Mike Murphy 703-259-1757
703-638-8547 Michael.Murphy@vdot.virginia.gov
NR15-142

Oct. 29, 2015



ARLINGTON RIDGE ROAD RAMP CLOSURES THIS WEEKEND
Milling and paving of ramps linking South Arlington Ridge to I-395, Route 27

ARLINGTON From 9 p.m. Friday, October 30 to 11 a.m. Saturday, October 31, and from 9 p.m. Saturday, October 31 to 11 a.m. Sunday, November 1, the ramp from Route 27 to South Arlington Ridge Road and the ramp from South Arlington Ridge to Route 27 and northbound I-395 will be closed for milling and paving, according to the Virginia Department of Transportation.

Drivers are asked to avoid the area and take alternate routes to minimize impacts.

Route 27 to South Arlington Ridge ramp traffic will be detoured via southbound I-395 and South Glebe Road to South Arlington Ridge (see map). South Arlington Ridge to Route 27 ramp traffic will be detoured via South Lynn Street, Army Navy Drive, South Joyce Street and Columbia Pike to Route 27 (see map). South Arlington Ridge to northbound I-395 ramp traffic will be detoured via South Lynn Street, Army Navy Drive, South Joyce Street, South 15th Street and Route 1 to northbound I-395 (see map). Detour signs will be in place to guide motorists.

Electronic message signs are in place to notify drivers of the scheduled work.

The work is part of the $2.2 million project to repair the South Arlington Ridge Road ramp bridges over I-395 and Army Navy Drive. The project is scheduled for completion in December.

Follow VDOT Northern Virginia on Twitter: @vadotnova

END



Information in VDOT news releases was accurate at the time the release was published. For the most current information about projects or programs, please visit the project or program Web pages. You may find those by searching by keyword in the search Virginia DOT box above.

Page last modified: March 10, 2017