| RELEASE: CONTACT: |
IMMEDIATE Joan Morris 703-259-1799 Joan.Morris@vdot.virginia.gov Jennifer McCord 703-259-1779 jennifer.mccord@vdot.virginia.gov |
NR13-8 Feb. 12, 2013 |
BEULAH ROAD BRIDGE WILL BE REDUCED TO ONE LANE
Temporary signals will control traffic
FAIRFAX – The Virginia Department of Transportation is installing two temporary traffic signals on either end of the bridge on Beulah Road that crosses the Dulles Toll Road. The signals will help control traffic while the bridge is reduced to one lane for ongoing construction.
The signals will be operational on Feb. 15 and will remain in place for about three months. The $3.4 million bridge rehabilitation project will be finished by summer. Visit the VDOT project page for more details.
Tweet
Information in VDOT news releases was accurate at the time the release was published. For the most current information about projects or programs, please visit the project or program Web pages. You may find those by searching by keyword in the search Virginia DOT box above.
