RELEASE:

CONTACT:
IMMEDIATE

Marshall Herman 757-925-1660 (office) 804-652-9689 (mobile)
Marshall.Herman@vdot.virginia.gov

HRO-71660

March 18, 2014



LYNNHAVEN PARKWAY WIDENING PROJECT READY TO BEGIN
Construction scheduled to start this week

VIRGINIA BEACH – A project to widen Lynnhaven Parkway to four lanes from Indian River Road to Centerville Turnpike is scheduled to start construction this week, weather conditions permitting.

American Infrastructure was awarded the $18.9 million construction contract to add an additional lane in each direction and a bridge at the canal located between Centerville Turnpike and Indian River Road to create a connection between the cities of Chesapeake and Virginia Beach.

During construction, one lane of traffic will be maintained in both directions. Motorists should be alert to temporary flagging operations as needed throughout the duration of the project.   

The project is scheduled for completion in fall 2016.

To learn more about the project, please visit: http://www.virginiadot.org/projects/hamptonroads/lynnhaven_parkway_widening.asp

 

Motorists are encouraged to visit www.511virginia.org, call 511, download Virginia’s free 511 mobile app or listen to Highway Advisory Radio (HAR) 1680 AM or call the Traffic Information Line at 757-361-3016 for current traffic and travel information. Information is also available on Twitter @VaDOTHR.

 

###



Information in VDOT news releases was accurate at the time the release was published. For the most current information about projects or programs, please visit the project or program Web pages. You may find those by searching by keyword in the search Virginia DOT box above.

Page last modified: March 18, 2014