RELEASE:

CONTACT:
IMMEDIATE - 9 a.m.

Kelly Hannon 540-374-3344
Kelly.Hannon@VDOT.Virginia.Gov

LaTina W. Bundy 540-899-4560
Tina.Bundy@VDOT.virginia.gov

FRED-96219

May 25, 2016



UPDATE: BRIDGE DECK REPAIR CONTINUES ON I-95 SOUTHBOUND IN STAFFORD
I-95 southbound lane closures will be in place through early afternoon today

FREDERICKSBURG – Motorists traveling on Interstate 95 southbound in the Fredericksurg area should anticipate delays near Exit 133/Route 17 in Stafford County through early afternoon as crews complete an emergency bridge repair.

I-95 southbound will be reduced to a single lane at the Route 17 overpass until 11 a.m. this morning. Two southbound lanes will open at 11 a.m. All lanes will open by 3 p.m.

The on-ramp to I-95 southbound from Route 17 westbound will be closed through 3 p.m. today. Southbound I-95 motorists may still exit to Route 17 eastbound and westbound at the I-95 interchange.

This morning, two lane closures are needed so crews can pour concrete into a section of the bridge deck removed overnight. A single lane will remain closed through 3 p.m. to allow the concrete to set.

Yesterday afternoon, crews temporarily repaired a hole in the right travel lane by covering it with secured steel plates. Crews worked overnight to remove deteriorated concrete around the hole and install reinforced steel that will support the new concrete.

511Virginia

Motorists can find real-time information about work zones, traffic, incidents, and road conditions in Virginia at 511Virginia.

Download the free mobile 511 app for Apple and Android devices to stay connected, or visit www.511Virginia.org. Motorists also can reach 511Virginia by calling 511 from any phone in Virginia.

(END)

VDOT’s 14-county Fredericksburg District includes the counties of Caroline, King George, Spotsylvania and Stafford in the Fredericksburg area; Northumberland, Richmond, Lancaster and Westmoreland counties in the Northern Neck; Essex, Gloucester, King & Queen, King William, Mathews and Middlesex counties in the Middle Peninsula.

 



Information in VDOT news releases was accurate at the time the release was published. For the most current information about projects or programs, please visit the project or program Web pages. You may find those by searching by keyword in the search Virginia DOT box above.

Page last modified: May 25, 2016