RELEASE:

CONTACT:
IMMEDIATE

Kelly Hannon 540-374-3344
Kelly.Hannon@VDOT.Virginia.Gov

LaTina W. Bundy 540-899-4560
Tina.Bundy@VDOT.virginia.gov

FRED-71483

March 7, 2014



VDOT TO INSPECT NORRIS BRIDGE
Daytime, single-lane closures will be required on Route 3 bridge over the Rappahannock River

FREDERICKSBURG–Motorists will encounter single-lane closures on the Robert O. Norris Bridge on Route 3 between Monday, March 10 and Friday, March 14 for a scheduled inspection of the bridge.

 

Single-lane closures will occur on the bridge between 9 a.m. and 3 p.m. on weekdays. Flagging crews will direct traffic to take turns crossing the bridge in the open travel lane.

 

The Norris Bridge spans the Rappahannock River, and connects Lancaster and Middlesex counties.

 

Real-time listings of road closures in Virginia are available on VDOT’s 24-hour traffic and travel information website, www.511Virginia.org.

 

Motorists can also access 511Virginia by calling 511 from any telephone in Virginia, or downloading a free 511Virginia mobile app.

 

(END)



Information in VDOT news releases was accurate at the time the release was published. For the most current information about projects or programs, please visit the project or program Web pages. You may find those by searching by keyword in the search Virginia DOT box above.

Page last modified: March 7, 2014