RELEASE:

CONTACT:
IMMEDIATE

Will Merritt 540-829-7370
William.Merritt@vdot.virginia.gov
cell 540-717-8376
Stacy Londrey 540-727-3201
Stacy.Londrey@vdot.virginia.gov
cell 540-718-7698
CULP 2015-076

May 13, 2015



NEW TRAFFIC PATTERN AT WARNER PKWY. INTERSECTION
Northbound motorists will now have two through lanes to reach East Rio Road

LanesJWPatRio

CULPEPER — Motorists will notice a new traffic pattern at the intersection of the John W. Warner Parkway and Route 631 (East Rio Road) in Albemarle County. On April 29, the Virginia Department of Transportation modified the pavement markings so the parkway’s northbound right-turn lane will now operate as a shared right-through lane.

The improved configuration and corresponding signal timing adjustments, which are ongoing as traffic shifts to use the new pattern, will reduce congestion by doubling the number of vehicles that can travel north through the intersection during each signal cycle.

John W. Warner Parkway is a 1.8-mile roadway running from East Rio Road south to the Route 250 Bypass in the city of Charlottesville. The parkway was constructed in two segments, with the county’s portion opened to traffic in early 2012. The city’s portion went into operation in February in conjunction with the ribbon-cutting for the Route 250 Bypass/McIntire Road interchange.

(END)



Information in VDOT news releases was accurate at the time the release was published. For the most current information about projects or programs, please visit the project or program Web pages. You may find those by searching by keyword in the search Virginia DOT box above.

Page last modified: May 13, 2015