RELEASE:

CONTACT:
IMMEDIATE

Michelle Earl 276-669-9999
Michelle.Earl@vdot.virginia.gov

BR-1102

Jan. 6, 2011



State Route 224/US Route 23 Corridor Study Citizens' Informatiion meeting scheduled for January 18

BRISTOL, VA – The Kingsport Municipal Planning Organization will hold a citizen information meeting for the Route 224/ US Route 23 corridor study on Tuesday, January 18 from 5 – 7 p.m. at Gate City High/Middle School Cafeteria, 178 Harry Fry Drive in Gate City. 

The citizen information meeting will assist the study team with development of the long-term transportation plan for the US 23 and Route 224 (Wadlow Gap Rd.) corridors.

There will be a 20-minute formal presentation at 5:15 p.m.; however, citizens will be able to speak with study representatives regarding the project anytime between 5 and 7 p.m.

If Scott County schools are closed on January 18 due to a snow event, this workshop will be rescheduled for January 27 at the same time and location.

For special assistance to attend, please call (423) 224-2670. Si usted necesita la traducción, por favor entre en contacto por el teléfono en (423) 224-2670.

For more information or to be added to the study mailing list to receive future project updates, visit the study website at www.route23-224corridor.com.

(END)



Information in VDOT news releases was accurate at the time the release was published. For the most current information about projects or programs, please visit the project or program Web pages. You may find those by searching by keyword in the search Virginia DOT box above.

Page last modified: Oct. 17, 2012