Interstate 66 Spot Improvements

I-66 shield

This project is in the preliminary engineering phase of three spot improvements on westbound I-66 inside the Capital Beltway in Northern Virginia. These spot improvements were identified as the most congested locations during a 2004-2005 feasibility study and a subsequent 2006 traffic study.

More Information

    PDF Project Contacts (35 KB)

    I-66 Spot Improvement Aerial Displays: (PDF PDFs)
    Section 1 (a) - Fairfax Drive to Sycamore Street (1 MB)
    Section 1 (b) - Fairfax Drive to Sycamore Street (2 MB)
    Section 1 (c) - Fairfax Drive to Sycamore Street (2 MB)
    Section 2 (a) - Washington Boulevard to Dulles Connector (1 MB)
    Section 2 (b) - Washington Boulevard to Dulles Connector (2 MB)
    Section 2 (c) - Washington Boulevard to Dulles Connector (2 MB)
    Section 3 (a) - Lee Highway to Glebe Road (1 MB)
    Section 3 (b) - Lee Highway to Glebe Road (1 MB)

    October 27, 2008 Public Hearing:
    PDF Hearing Presentation (8 MB)
    PDF Hearing Brochure (608 KB)
    PDF Web Comment Form (26 KB)
    PDF I-66 Noise Study (14 MB)
    PDF I-66 Air Study (3 MB)
    PDF Categorical Exclusions (24 KB)

    September 26, 2007 Public Meeting:
    PDF Project Newsletter (227 KB)
    
PDF Citizen Information Meeting Brochure (416 KB) 
    PDF Citizen Information Meeting Presentation (740 KB) 
    PDF Citizen Information Meeting Summary (19 KB)

    Click here for information on the Department of Rail and Public Transportation's I-66 Transit/Transportation Demand Management Study.  

Please visit this Web site for additional updates.

Page last modified: April 21, 2009