Design-Build Proposal Submittals and Rankings

The following table identifies the list of Offerors, short listed, and final rankings of firms that have submitted proposals through a one-phase or two-phase design-build procurement process.

After review of proposals from a one-phase process, the Offerors will be listed in alphabetical order. The final rankings will be listed from highest to lowest. The top-ranked firm will be first.

After review of the Statements of Qualifications (SOQs) in a two-phase procurement, the top-ranked firms will be listed in the short list column for that RFP. The firms are listed in alphabetical order.

After the proposal evaluations, the final rankings will be listed from highest to lowest. The top-ranked firm will be displayed first. 

Construction

Note: Hyperlinks in the table below will direct you to corresponding Proposal Documents for the Offeror. Document quality may be reduced due to file size limitations.
 

RFP No. Project No./ Description Offerors Short List Final Ranking Contract Awarded
 C00077383DB80 Design-Build Project for Route 29 Solutions

Conti Enterprises/Louis Berger Group

Lane-Corman (LCJV)/RK&K

Shirley/Dewberry

Skanska-Branch (SBJV)/JMT

Wagman/Parsons Transportation Group

 

 

Lane-Corman (LCJV)/RK&K

Shirley/Dewberry

Skanska-Branch (SBJV)/JMT
 
   
 C00105515DB78 Odd Fellows Road Interchange at US Route 29/460 and Road Improvements

English/ Parsons Brinckerhoff

Orders/ Clark Nexsen

Wagman/ JMT

 

 

English/ Parsons Brinckerhoff

Orders/ Clark Nexsen

Wagman/ JMT
   
C00106320DB79 Greenview Drive Widening

Branch/ McCormick Taylor

DLB/ AMT

English/ Parsons Brinckerhoff

Fielders Choice/ Louis Berger

Orders/ Clark Nexsen

Wagman/ JMT

Branch/ McCormick Taylor

English/ Parsons Brinckerhoff

Orders/ Clark Nexsen

   
C00076244DB76 Route 659 (Belmont Ridge Road) - Reconstruct to 4 Lanes

American Infrastructure/ WR&A

Branch/ RDA

Lane/ JMT

Shirley/ Dewberry

Wagman/ Parson Brinckerhoff

 

American Infrastructure/ WR&A

Lane/ JMT

Shirley/ Dewberry
 
   
C00081009DB60 I-66 - Vienna/Fairfax-GMU Metrorail Accessibility Improvement
 

Cherry Hill/ Stantec

Conti Enterprises/ Louis Berger

Corman/ Parsons

Lane/ WRA

Shirley/ Dewberry

Wagman/ JMT

 

Corman/ Parsons

Lane/ WRA

Wagman/ JMT
   
C00082135DB77 Route 7 Widening and Bridge Rehabilitation
Over Dulles Toll Road and Airport Access Highway

Conti Enterprises/ Louis Berger

Corman/ RK&K

Fort Myer/ Volkert

Lane/ JMT

Martins/ AMT

Orders/ Clark Nexsen

Shirley/ Dewberry

Wagman/ RDA

 

Corman/ RK&K

Lane/ JMT

Wagman/ RDA
   
C00103318DB71 Braddock Road and Pleasant Valley Road
Intersection Improvements

Fielder’s Choice/ Louis Berger

Fort Myer/ WBCM

Tavares Concrete/ Christopher Consultants

Wagman/ AMT

N/A

Fort Myer / WBCM
$4,178,333.00

Wagman / AMT
$4,366,106.00

Fielder’s Choice / Louis Berger
$5,890,795.25

Tavares / Christopher
$6,283,461.40

 

Award Letter
C00104905DB75 I-64 Capacity Improvements - Segment I

American Infrastructure/ RK&K

EV Williams/ WR&A

Lane/ Parsons Brinckerhoff

Shirley/ Dewberry

Wagman/ KCI Technologies

 

American Infrastructure/ RK&K

Shirley/ Dewberry

Wagman/ KCI Technologies

   
C00105130DB72 I-495 Northern Section Shoulder Use

Fort Myer/ Volkert

Francis O. Day/ JMT

Lane/ Sabra Wang

 

N/A

Fort Myer/ Volkert
$15,388,614.00

Francis O. Day/ JMT
$19.873.709.50

Lane/ Sabra Wang
$24,708,875.00

 

Award Letter
C00085623DB74 I-95 at Temple Avenue Interchange Improvements

Abernathy/ Timmons

American Infrastructure/ RDA

Corman/ AMT

Curtis/ Parsons Brinckerhoff

E.V. Williams/ RK&K

George Nice & Sons/ RS&H

Shirley/ Dewberry

Wagman/ JMT

 

American Infrastructure/ RDA

Corman / AMT

Shirley/ Dewberry

   
C00103665DB73 Capital Trail - Park

Curtis/ Parsons Brinckerhoff

Fielder's Choice/ Louis Berger

George Nice & Sons/ Timmons

Henderson/ Atkins
 

N/A

George Nice & Sons/ Timmons
$6,298,000.00

Fielder's Choice/ Louis Berger
$7,336,000.00

Henderson/ Atkins
$7,695,392.00

Curtis/ Parsons Brinckerhoff
$8,499,900.00

 

Award Letter
C00104814DB69 I-77 Active Traffic and Safety Management System (ATSMS)

ALS of North Carolina/ Atkins

G4S Technology/ Gannet Fleming

Midasco/ Dewberry

Richardson-Wayland/ AECOM

N/A

G4S Technology/ Gannett Fleming
$7,495,828.00

Midasco/ Dewberry
$7,692,200.00

ALS of North Carolina/ Atkins
$8,532,626.75

Richardson-Wayland/ AECOM
$8,957,750.00

 

Award Letter
C00104815DB70 I-64 Active Traffic and Safety Management System (ATSMS)

Bruce & Merrilees/ Pennoni

G4S Technology/ Gannet Fleming

Midasco/ Dewberry

Richardson-Wayland/ AECOM

 

N/A

G4S Technology/ Gannett Fleming
$4,599,262.00

Bruce & Merrilees/ Pennoni
$4,648,000.00

Midasco/ Dewberry
$8,443,239.00

Richardson-Wayland/ AECOM
$10,816,100.00

 

Award Letter
C00081457DB57 Route 35 Bridge Replacement

Abernathy/ Ammann & Whitney

American Infrastructure/ Moffatt & Nichol

Bryant/ Clark Nexsen

Corman/ Volkert

English/ RK&K

McLean/ PB

Orion Marine/ TranSystems

Wagman/ JMT

Waterfront Marine/ URS

N/A

Waterfront Marine/ URS
$9,476,000.00, BCDs=300

McLean/ PB
$9,793,753.00, BCDs=298

Wagman/ JMT
$9,873,759.00, BCDs=365

English/ RK&K
$10,233,600.00, BCDs=365

Abernathy/ Ammann & Whitney
$10,615,830.50, BCDs=365

Corman/ Volkert
$11,164,017.00, BCDs=365

Bryant/ Clark Nexsen
$11,435,000.00, BCDs=313

Orion/ TranSystems
$11,833,500.00, BCDs=330

American Infrastructure/ Moffatt & Nichol
$11,944,000.00, BCDs=365

 

Award Letter
C00097529DB64 Route 606 Loudon County Parkway/ Old Ox Road Reconstruction and Widening

American Infrastructure/ RK&K

Archer Western/ Parsons

Branch Highways/ RDA

Lane/ JMT

Shirley/ Dewberry

 

American Infrastructure/ RK&K

Lane/ JMT

Shirley/ Dewberry

Shirley/ Dewberry

American Infrastructure/ RK&K

Lane/ JMT

Award Letter
C00100391DB61 Rolling Road/Franconia-Springfield Parkway Interchange Improvements

American Infrastructure/ RDA

Cherry Hill/ JMT

Martins/ STV

Shirley/ Dewberry

 

American Infrastructure/ RDA  

Cherry Hill/ JMT

Shirley/ Dewberry

American Infrastructure/ RDA
$9,802,000.00

Shirley/ Dewberry
$10,979,304.00

Cherry Hill/ JMT
$12,468,000.00

 

Award letter
C00100566DB63 Interstate 66/Route 15 Interchange Reconstruction

Archer Western/ Parsons

Cherry Hill/ JMT

Lane/ Rinker Design Associates

Shirley/ Dewberry

Wagman/ Gannett Fleming

 

Cherry Hill/ JMT

Lane/ RDA

Shirley/ Dewberry

Lane/ RDA

Shirley/ Dewberry

Cherry Hill/ JMT
Non-Responsive

Award Letter
C00104418DB68 Gloucester Parkway Extension

American Infrastructure/ WR&A

Archer Western/ Parsons

Cherry Hill/ Stantec

Corman Construction/ RK&K

Fort Myer/ TY Lin

Lane/ Pennoni

Shirley/ Dewberry

Wagman/ KCI Technologies

 

American Infrastructure/ WR&A

Corman Construction/ RK&K

Shirley/ Dewberry

Shirley/ Dewberry
$26,277,034.20

Corman Construction/ RK&K
$27,699,425.00

American Infrastructure/ WR&A
$32,794,000.00

 

Award Letter
C00104103DB62 Walney Road Bridge Replacement and Road Widening

American Infrastructure/ WR&A

Branch Highways/ RDA

Fort Myer/ TY Lin

General Excavation Inc./ RK&K

Lane/  JMT

Shirley/ Dewberry

 

American Infrastructure/ WR&A

Lane/ JMT

Shirley/ Dewberry

American Infrastructure/ WR&A
$11,222,600.00

Lane/ JMT
$11,279,510.00

Shirley/ Dewberry
$18,980,440.00

Award Letter
C00104331DB67 I-264 Pavement Rehabilitation

Branscome, Inc./ Dewberry Consultants

Curtis Contracting, Inc./ GAI Consultants, Inc.

Fort Myer Construction/ AMT Consulting Engineers

Lane / VHB

Curtis Contracting/ GAI Consultants

Fort Myer/

Lane/ VHB

Curtis/ GAI Consultants
$60,950,000.00

Lane/ VHB
$61,080,575.00

Fort Myer/ AMT
$62,648,831.56

 

Award Letter
C00104330DB66 I-64 Pavement Rehabilitation

Branscome, Inc./ Dewberry Consultants

Curtis Contracting, Inc./ GAI Consultants, Inc.

Fort Myer Construction/ AMT Consulting Engineers

Lane / VHB

 

Branscome/ Dewberry

Fort Myer/ AMT

Lane/ VHB

Branscome/ Dewberry
$14,449,636.00

Fort Myer/ AMT
$16,894,484.00

Lane/ VHB
$17,935,486.00

 

Award Letter
C00104329DB65 I-64 and I-264 Pavement Rehabilitation

Branscome, Inc./ Dewberry Consultants

Curtis Contracting, Inc./ GAI Consultants, Inc.

Fort Myer Construction/ AMT Consulting Engineers

Lane/ VHB

 

Branscome/ Dewberry

Fort Myer/ AMT

Lane/ VHB

Lane/ VHB
$30,742,170.00

Branscome/ Dewberry
$33,818,774.00

Fort Myer/ AMT
$35,368,300.00

 

Award Letter
C00088699DB59 Fall Hill Avenue and Mary Washington Boulevard Extension

American Infrastructure/ Rinker Design Associates

Archer Western/ Parsons Transportation Group

Corman/ WR&A

General Excavation/ RK&K

Lane/ Virginia Design Partners - Non-Responsive

Shirley/ Dewberry

W.C. English/ CDM Smith

 

AI/ RDA

Archer Western/ Parsons

Corman/ WR&A

Corman/ WR&A

AI/ RDA

Archer Western/ Parsons

Award Letter
C00077322DB52 Route 29 Bridge over Little Rocky Run American Infrastructure/ KCI Technologies

Fort Myer/ TY Lin

Martins Construction/ GAI Consultants

Shirley/ Dewberry

N/A

Shirley/ Dewberry
$11,433,000

American Infrastructure/ KCI Technologies
$11,570,000

Fort Myer/ TY Lin
$11,720,000

Martins Construction/ GAI Consultants
Non Responsive

 

Award Letter
C00014657DB56 Route 3 Widening

American Infrastructure/ Rinker Design Associates

Branch Highways/ JMT

Brancscome/ Michael Baker Jr.

Curtis/ PB

English/ WR&A

Faulconer/ Timmons

General Excavation/ Volkert

Lane/ RK&K

Route 3 Builders JV/ Louis Berger

Shirley/ Dewberry

 

Branch Highways/ JMT

Lane/ RK&K

Shirley/ Dewberry

Branch Highways/ JMT
$23,593,455.00

Shirley/ Dewberry
$32,323,232.00

Lane/ RK&K
$34,504,710.20

 

Award Letter
C00058599DB54 Route 7 - Westbound Truck Climbing Lane

American Infrastructure/ JMT

Archer Western/ Parsons

Branch Highways/ RDA

Cherry Hill/ Stantec

Corman Construction/ AMT

Fort Myer/ TY Lin International

General Excavation Inc./ WR&A

Lane/ VHB

Shirley/ Dewberry

Trumbull Corporation/ HDR Engineering

 

Branch Highways / RDA

Corman Construction / AMT

Shirley / Dewberry
Shirley / Dewberry

Branch Highways / RDA

Corman Construction / AMT
Award Letter
C00086280DB58 Capital Trail - Varina

Abernathy/ Ammann & Whitney

American Infrastructure/ Rinker

Blythe/ RK&K

Curtis/Parsons Brinckerhoff

George Nice & Sons/ Timmons

Henderson/ Atkins North America

Southwood Building Systems/ VHB

 

N/A

Henderson/ Atkins North America
$8,433,732.00

Curtis/ Parsons Brinckerhoff
$9,525,000.00

American Infrastructure/ Rinker
$9,674,000.00

George Nice & Sons/ Timmons
$10,060,000.00

Abernathy/ Ammann & Whitney
$11,548,386.00

Blythe/ RK&K
$11,988,000.00

Southwood Building Systems/ VHB
$14,230,535.00

 

Award Letter
C00070542DB55 I-64 Widening and Route 623 Interchange Improvements

American Infrastructure/ Rinker

Archer Western/ URS

Branscome/ Timmons

Cherry Hill/ Louis Berger

Corman/ RK&K

Curtis Contracting/ Parsons Brinckerhoff

English/ AECOM

E.V. Williams/ WR&A

Key Construction/ JMT

Shirley/ Dewberry

Vecellio & Grogan/ VHB

 

Corman/ RK&K

E.V. Williams/ WR&A

Shirley/ Dewberry

Corman/ RK&K

E.V. Williams/ WR&A

Shirley/ Dewberry

Award letter
C00099256DB53 Sycolin Road Overpass of the Route 7/15 Bypass in Leesburg

American Infrastructure/ Triplett-King

Corman Construction/ Volkert

Fort Myer Construction/ Greenhorne & O'Mara

General Excavation, Inc./ Kimley-Horn

Shirley Contracting/ Dewberry

 

N/A

Shirley Contracting/ Dewberry
$12,185,855.00

American Infrastructure/ Triplett-King
$14,284,500.00

Corman Construction/ Volkert
$16,074,151.00

General Excavation, Inc./ Kimley-Horn
$16,850,000.00

Fort Myer Construction/ Greenhorne & O'Mara
$21,914,000.00

 

Award letter
C00086279DB51 Capital Trail – New Market Heights

American Infrastructure-VA, Inc./ Rinker Design Associates

Branscome, Inc./ Vanasse Hangen Brustlin

Corman Construction, Inc./ Pennoni Associates

Curtis Contracting, Inc./ Parsons Brinckerhoff

George Nice & Sons, Inc. / Timmons Group

Henderson, Inc./ Atkins North America

Howard Brothers Contractor, Inc./ A. Morton Thomas and Associates

 

N/A

Henderson, Inc./ Atkins North America
$6,961,186.00

American Infrastructure-VA, Inc./ Rinker Design Associates
$8,451,118.00

Curtis Contracting, Inc./ Parsons Brinckerhoff
$8,680,000.00

Howard Brothers Contractor, Inc./ A. Morton Thomas and Associates
$8,996,018.43

Corman Construction, Inc./ Pennoni Associates
$9,212,900.00

George Nice & Sons, Inc. / Timmons Group
$9,387,000.00

Branscome, Inc./ Vanasse Hangen Brustlin
$11,053,668.00

 

Award letter
C00096261DB50 I-395 HOV Ramp at Seminary Road with I-395 NB Auxiliary Lane Extension

Archer Western / Parsons Transportation Group

Cherry Hill / JMT

CK Constructors (Corman - Kiewit) / Parsons Brinckerhoff

FAI Constructors (Ferrovial Agroman - American Infrastructure) / AECOM

Lane / STV

Shirley / Dewberry

United Infrastructure - Fort Myer / TY Lin

 

Archer Western / Parsons Transportation Group

CK Constructors (Corman-Kiewit) / Parsons Brinckerhoff

Shirley / Dewberry

 

Archer Western / Parsons Transportation Group

Shirley / Dewberry

CK Constructors (Corman-Kiewit) / Parsons Brinckerhoff

Award letter
C00093577DB49 I-66 Widening (Haymarket to Gainesville)

American Infrastructure/ HDR

Archer Western/ Parsons

Corman/ AMT

Facchina/ JMT

Fort Myer/ T.Y. Lin

Lane/ RDA

Shirley/ Dewberry

 

Corman/ AMT

Lane/ RDA

Shirley/Dewberry

Shirley/ Dewberry

Corman/ AMT

Lane/ RDA

Award letter
C00086453DB48 I-64/ Zion Crossroads
Interchange
Improvements

American Infrastructure/ Rinker

Archer Western/ TranSystems

Branscome/ Clark-Nexsen

Corman/ Parsons

Curtis Contracting/ Parsons Brinkerhoff

Faulconer/ Lochner

Fielder’s Choice Enterprises (FCE)/ Louis Berger

General Excavation Inc / Kimley-Horn

Howard Brothers/ AMT

Key Construction/ JMT

Shirley/ Dewberry

 

Corman/ Parsons

General Excavation Inc/ Kimley-Horn

Shirley/ Dewberry

Corman/ Parsons

General Excavation Inc/ Kimley-Horn

Shirley/ Dewberry

Award letter
C00075877DB47 I-64 Exit 91
Interchange
Improvements

American Infrastructure/ Rinker

Archer Western/ TranSystems

Branch Highways/ WR&A

CH2MHill

Corman/ Louis Berger

Curtis/ Parsons Brinkerhoff

English/ RK&K

General Excavation/ Volkert

Key/ JMT

Lane/ H.W. Lochner

Orders/ CDM Smith

R.R. Dawson/ KCI

Shirley/ Dewberry

Vecellio & Grogan/ Michael Baker Jr.

Wagman/ Parsons

 

American Infrastructure/ Rinker Design Associates

Orders/ CDM Smith

Shirley/ Dewberry



 

Shirley/ Dewberry

Orders/ CDM Smith

American Infrastructure/ Rinker Design Associates
Award letter
C00102419DB44

Route 29/ Charlottesville Bypass

 

 

 

 

* Offerors who are no longer participating in this procurement

American Infrastructure/ Kimley-Horn

Archer Western/ Heath and Lineback *

CH2MHILL

Charlottesville Bypass Constructors (Shirley-English)/ Dewberry

CK Constructors (Corman-Kiewit)/ Jansen and Spaans *

Granite-Wagman/ Gannett Fleming

Lane/ RK&K

Skanska-Branch/ JMT

United Infrastructure/ T.Y. Lin *

Zachry/ TranSystems

N/A

Skanska-Branch/JMT
$135,988,092

American Infrastructure/Kimley-Horn
$139,738,715

CH2MHILL
$149,879,827

Lane/RK&K
$152,484,607

Charlottesville Bypass Constructors (Shirely-English)/Dewberry
$175,776,716

Zachry/TranSystems
$192,000,000

Granite-Wagman/Gannett Fleming
$214,239,805

 

Award Letter
C00098017DB46 I-66 Active Traffic Management

American Lighting & Signalization/ Atkins

B&B Signal Company/ ALA

Chesapeake Electrical Systems/ Jacobs

Fort Meyer Construction/ AECOM

G4S Technology/ Gannett Fleming

Lane/ Rinker Design Associates

Midasco/ Dewberry

TransCore/ Parsons Brinckerhoff

Lane/ Rinker Design Associates

Midasco/ Dewberry

TransCore ITS/ Parsons Brinckerhoff
TransCore ITS/Parsons Brinckerhoff

Midasco/Dewberry

Lane/Rinker Design Associates
Award Letter
C00016595DB45 I-581/ Valley View Interchange Phase II

American Infrastructure/ Rinker Design Associates

Archer Western/ Parsons

Branch Highways/ AECOM

CH2MHILL

English/ Dewberry

Key/ JMT

Lane/ STV

W-L Construction/ A. Morton Thomas

 

American Infrastructure/ Rinker Design Associates

Key/ JMT

Lane/ STV

 

Lane/ STV

AI/ RDA

Key/ JMT

Award letter
C00081562DB2 Capital Trail -
Sherwood
Forest

American Infrastructure/ Rinker Design Associates

Branscome/ Vanasse Hangen Brustlin

Bryant Contracting/ AECOM Technical Services

Corman Construction/ Whitman, Requardt & Associates

Curtis Contracting/ PB Americas

George Nice & Sons/ Timmons Group

Shirley Contracting/ Dewberry & Davis

W.C. English/ Rummel, Klepper & Kahl

N/A

Curtis Contracting/ PB Americas
$8,790,000.00

George Nice & Sons/ Timmons Group
$10,677,000.00

W.C. English/ Rummel, Klepper & Kahl
$12,080,500.00

Corman Construction/ Whitman, Requardt & Associates
$12,186,384.40

Branscome/ Vanasse Hangen Brustlin
$12,859,053.00

American Infrastructure/ Rinker Design Associates
$12,867,440.00

Bryant Contracting/ AECOM Technical Services
$13,645,000.00

Shirley Contracting/ Dewberry & Davis
$17,396,340.00

 

Award letter
C00093144DB01 Pacific Boulevard Extension

American Infrastructure/ Bowman Consulting

The Anderson Co./ Timmons

General Excavation Inc./ J2 Engineers

Martin & Gass/ Rinker Design Associates

Shirley Contracting/ Dewberry & Davis

William A. Hazel/ RK&K

n/a

Shirley Contracting/ Dewberry & Davis
$5,368,600.00

American Infrastructure/ Bowman Consulting
$6,320,500.00

William A. Hazel/ RK&K
$6,436,500.00

The Anderson Co./ Timmons
$6,496,849,50

General Excavation Inc./ J2 Engineers
$6,631,279.00

Martin & Gass/ Rinker Design Associates
$7,425,000.00

 

Award letter
C00084743DB31 I-66 Pavement Rehabilitation

AIK/JMT

Cherry Hill/RK&K

Fort Myer/Volkert

Lane/ VHB

n/a

 

Fort Myer/Volkert
$37,938,252.41

Cherry Hill/RK&K
$41,494,777.00

Lane/VHB
$41,850,000.00

AIK/JMT
$46,909,000.00

 

Award letter
C00094089DB39 I-581/Elm Avenue interchange improvements

Abernathy Construction Corp./ Amman and Whitney

Allegheny Construction Co./ Mattern and Craig Inc.

American Infrastructure - VA Inc./ Rinker Design Associates

DLB Inc./ Clark Nexsen

English Construction Co. Inc./ Rummell Klepper and Kahl

Key Construction Co. Inc./ Johnson Mirmiran and Thompson

McLean Contracting Co./ Halcrow Inc.

Orders Construction Co./ Wilbur Smith Associates

R.R. Dawson Bridge Co./ A. Morton Thomas and Associates Inc.

United Infrastructure Group Inc./ LPA Group Inc.

 

American Infrastructure - VA Inc./ Rinker Design Associates

Key Construction Co. Inc./ Johnson Mirmiran and Thompson

R.R. Dawson Bridge Co./ A. Morton Thomas and Associates Inc.

 

American Infrastructure-VA. Inc/ Rinker Design Associates

Key Construction Co/ Mattern and Craig Inc

R.R. Dawson Bridge Co./ A. Morton Thomas Associates Inc.
Non Responsive
Award Letter
C00070550DB40 I-295 / Meadowville Road Interchange Project

American Infrastructure/Dewberry

Branscome/JMT

Branch/RKK

Curtis/PB Americas

English/AECOM

GEI/RDA

Key/Volkert

n/a

Curtis/PB Americas $11,715,000

Amerian Infrastructure/Dewberry $11,892,040

Key/Volkert $12,142,156

Branch/RKK $12,265,757

Branscome/JMT $12,467,943.64

English/AECOM $18,318,643

GEI/RDA
$19,977,941

 

Award letter
C00017831DB41 Route 60 – Main Street bridge replacement,
town of Clifton Forge

American Infrastructure/
Dewberry

DLB/Ammann & Whitney

English/Wilbur Smith

Hammond-Mitchell/Mattern & Craig

Orders/Clark Nexsen

 

American Infrastructure/
Dewberry

English/Wilbur Smith

Orders/Clark Nexsen

 

Orders/Clark Nexsen $3,488,800

American Infrastructure/Dewberry $3,850,000

English/Wilbur Smith $4,591,000
Award letter
C00011816DB38 Middle Ground Boulevard Extension, City of Newport News

Abernathy/ ATCS

American Infrastructure/ Rinker

Basic & Bryant/ Baker

Corman/ WR&A

Curtis/ PB Americas

EV Williams/ Kimley-Horn

Key/ JMT

Lane/ Gannett Fleming

RR Dawson/ AMT

Shirley/ Dewberry

Skanska – Branscome/ CH2MHill

 

American Infrastructure/ Rinker

Key/ JMT

Shirley/ Dewberry

American Infrastructure/ Rinker

Shirley/ Dewberry

Key/JMT: Non Responsive

Award letter
C00093413DB34B Route 61 Bridge Replacement, Narrows, Giles County

VecellioGrogan/ LPA

Misener Marine/ PBSJ

American Infrastructure/ Dewberry

Fairfield Echols/ TY Lin

Key Construction/ JMT

Fort Chiswell/ SAI

DLB/ AMT

Smith-Rowe/ STV-RWA

Lane/ Figg

McLean/ Clark Nexsen

Orders/ Halcrow

RR Dawson/ RK&K

 

American Infrastructure/ Dewberry

Key Construction/JMT

RR Dawson/ RK&K

Key Construction/ JMT

RR Dawson/ RK&K

American Infrastructure/ Dewberry

Award letter
C00093889DB36 Pacific Boulevard Widening

A&W Contracting Corporation/ Accompong Engineering Group

Corinthian Contractors, Inc./ Clark Nexsen Inc.

General Excavation, Inc./ Kimley-Horn and Associates, Inc.

Martin and Gass, Inc./ Rinker Design Associates

Shirley Contracting Company, LLC/ Dewberry Davis

William A. Hazel, Inc./ Bowman Consulting Inc.

The Anderson Company, Inc./ Timmons Group

 

n/a

General Excavation, Inc./ Kimley-Horn and Associates, Inc.: $1,850,103.40


A&W Contracting Corporation/ Accompong Engineering Group: $1,993,682.00


William A. Hazel, Inc./ Bowman Consulting Inc.: $2,233,600.00


Shirley Contracting Company, LLC/ Dewberry Davis: $2,236,900.00


The Anderson Company, Inc./ Timmons Group: $2,284,800.00


Martin and Gass, Inc./ Rinker Design Associates: $2,319,000.00


Corinthian Contractors, Inc./ Clark Nexsen, Inc.: Non-Responsive

Award Letter
C00094639DB37 Waxpool Road/Loudoun County Parkway Intersection Improvements Design-Build Project

General Excavation, Inc.


Martin and Gass, Inc.


Shirley Contracting Company, LLC


The Anderson Company, Inc


William A. Hazel, Inc.

 

Shirley Contracting Company, LLC: $1,199,750.00


The Anderson Company, Inc.: $1,234,614.00


General Excavation, Inc.: $1,575,000.00


William A. Hazel, Inc.: $2,505,792.00


Martin and Gass, Inc.: Non Responsive

Award letter
C00013528DB15C Route 27/244 Interchange Modifications CH2MHILL

Cherry Hill/JMT

Cianbro/Lawrie

Corman/PB Americas

Fort Myer/KCI

Lane/RDA

Shirley/Dewberry
 

CH2MHILL

Lane/RDA

Shirley/Dewberry

Shirley/Dewberry

Lane/RDA

CH2MHILL
Award letter
C00068757DB21 Route 50 Widening

CH2MHILL/CH2MHILL

Cherry Hill/JMT

Shirley/Dewberry

Lane/VHB

American Infrastructure/RK&K

Branch/RDA

English/PB Americas

General Excavation/KCI

 

CH2MHILL/CH2MHILL

Lane/VHB

Shirley/Dewberry
Shirley/Dewberry


Lane/VHB


CH2MHill/CH2MHILL
 
Award letter
C00085914DB9B Route 460 Connector –Phase I, RFP Bizzack/ENTRAN

Vecellio & Grogan/STV/RWA
 
n/a Bizzack/ENTRAN

Vecellio & Grogan/STV/RWA
Award letter
 
C00084117DB20B I-81 Corridor Safety and Operational Improvements
Montgomery Co.
AIK Constructors/PB

Branch/HNTB

CH2M Hill

English/WilburSmith

Lane/HDR

PhillipsJordan/LPA

VecellioGrogan/RDA

WrightBros/RKK
 

Branch/HNTB

CH2MHill

English/Wilbur Smith

CH2MHill

Branch/HNTB

English/WilburSmith
 

Award letter
C00087464DB33B Route 36 Improvements, Hopewell and Prince George County

Abernathy Construction / RDA

Blakemore /Louis Berger

Branscome / Timmons

Curtis Contracting /PB Americas

English / Baker

Faulconer / AMT

General Excavation / KCI

Jack Massie / Landmark Design

Key Construction /JMT

 

Abernathy Construction / RDA

Faulconer / AMT

Key Construction /JMT

Abernathy Construction/RDA

Key Construction/JMT

Faulconer Construction/AMT

Award letter
C000T7435DB24B Multiple Bridge Rehabilitation Project, Region 1

DLB Inc.

Cleco

Elk Knob

Estes Bros.

ICA

 

n/a

Estes Bros: $4,675,000.00

Elk Knob: $5,122,550.00

DLB Inc.: $6,120,000.00

ICA: $6,502,192.00

Cleco: $9,487,000.00

 

Award letter
C000T7440DB25 Multiple Bridge Rehabilitation Project, Region 2

DLB Inc.

UCI Virginia Inc.

Fort Chiswell

Cleco

English

Joseph B. Fay

n/a UCI: $9,468,200.00

English: $10,289,214.40

Fort Chiswell: $10,653,200.00

Cleco: $10,898,000.00

DLB Inc.: $11,289,000.00

J.B. Fay: $13,253,200.00
 
Award letter
C000T7441DB26 Multiple Bridge Rehabilitation Project, Region 3 UCI Virginia Inc.

Fort Chiswell

Fairfield Echols LLC

Corman Construction

ICA

GE Inc.
n/a ICA: $8,995,135.00

GE Inc.: $9,373,383.00

Corman: $10,772,000.00

UCI: $12,683,600.00

Fairfield Echols: $13,061,667.76

Fort Chiswell: $15,104,909.00
 
Award letter

C000T7442DB27
Multiple Bridge Rehabilitation Project, Region 4 UCI Virginia Inc.

Fort Chiswell

Abernathy Construction

Corman Constructiion

Byrant Construction

English

Mclean Contracting
 
n/a Bryant: $6,640,087.31

Abernathy: $7,192,188.00

UCI: $7,809,200.00

Corman: $8,720,000.00

English: $8,796,931.90

Fort Chiswell: $9,131,200.00

McLean: $9,180,000.00
 
Award letter
C000T7443DB28 Multiple Culvert Rehabilitation Project 2, Region 1 UCI Virginia Inc.

Fort Chiswell

DLB Inc.

W-L Construction

CLECO Corp.

English
 
n/a

Cleco: $2,951,000.00

W-L Paving: $3,492,285.66

DLB Inc.: $3,826,370.00

Fort Chiswell: $5,042,000.00

UCI: $7,779,400.00

English: $8,221,099.00
 

Award letter
C000T7447DB29 Multiple Culvert Rehabilitation Project 2, Region 2

Burleigh Construction

DLB Inc.

Cleco Corp.
 

n/a DLB Inc.: $2,850,144.00

Cleco: $2,947,000.00

Burleigh: $4,291,175.00
 
Award letter
C000T7450DB30 Multiple Culvert Rehabilitation Project 2, Region 3

UCI Virginia Inc.

DLB Inc.

Faulconer Construction

Fort Chiswell

Cleco Corp.

Allegheny Construction

General Excavation Inc.
 

n/a

Cleco: $914,000.00

Faulconer: $1,503,603.00

General Excavation.: $1,653,576.18

DLB Inc.: $1,708,121.00

Fort Chiswell: $1,887,600.00

Allegheny: $2,039,075.00

UCI: $2,635,600.00
 

Award letter
C00076552DB35 Approaches and Bridge over Tye River (Rte. 29 NBL)

Abernathy Construction Corp.


American Infrastructure – VA, Inc.

Burleigh Construction Co., Inc.


Corman Constr., Inc.


Curtis Contracting, Inc.


D.W. Lyle Corporation


DLB, Inc.


English Constr. Co, Inc.


Fort Chiswell Constr. Corp.


Haymes Brothers, Inc.


R.R. Dawson Bridge Co., LLC

n/a

American Infrastructure: $6,670,000.00

English: $6,904,995.60


Corman Constr.: $7,145,000.00


D.W, Lyle: $7,275,000.00


DLB Inc.: $7,347,436.00


Fort Chiswell: $7,743,520.70


Haymes Brothers: $8,009,000.00


Abernathy Constr.: $8,130,478.00


Burleigh Const.: $8,344,366.00


Curtis Contr.: $8,686,672.14


R.R. Dawson: $8,843,499.77

Award letter


 