CADD Support Section

Reference Guides

Electronic Submission
  • Electronic Plan Submission Process Flow Chart  revised 7-2007
  • Construction and Bridge Revisions  2-2008
  • Electronic Advertisement Submission 7-2008
  • Electronic Plan Coordination Review 7-2008
  • Electronic Plan Coordination Review For No-Plan Projects   7-2008
  • Pre-Advertisement Conference (PAC)   2-2008
  • Pre-Award Revisions    2-2008
  • Right-of-Way Plans  7-2008
  • Right-of-Way Revisions  2-2008
        

    Falcon
  • Document Manager Training Guide (Windows)
  • Instructions for Mass Update (Windows)
  • Instructions for CADD File Management System
  • Instructions for using Falcon V6
  • How to access Plan File Room in Falcon 6.5.08  
                          
    Falcon - MicroStation/Windows
  • Database Information revised 7-2007
  • Using Falcon To Access Central Office Plan File Room

    GEOPAK
  • Creating 5 Scale X-Sections
  • GEOPAK Merging Surfaces
  • GEOPAK Project Creation
  • Using Pluses 3PC Application

    GEOPAK - Using SDMS
  • Exporting Horizontal & Vertical Alignments Using SDMS (from IG)

  • Importing Horizontal & Vertical Alignments Using SDMS(GEOPAK)
        
    IGrds

  • Creating IG Reports
  • Creating Proposed Alignment Data-Sheets
  • Cross Sections Label (IGrds)

    MicroStation
  • County Map DGN Files
  • Creating Cross Section Plot File For Electronic Submission revised 6-2007
  • General Notes
  • Tips For Preparing Const./RW Title Sheet For Approval Signatures revised 4/2007
  • Using the Place Note Command
  • V8 Handout

    Plotting
  • DGN Preparation for Batch Plotting
  • Generating and Submitting TIF Files revised 7/2007
  • MicroStation Image Manager Training
  • Plotting with eQuorum PRF Generator
                     
    Web Plotting
  • Using the Document Submission Tool Application


  • Page last modified: July 2, 2008