Construction Directive Memoranda 2007-2010
CONSTRUCTION DIRECTIVE MEMORANDA
2010
| CD No. | Date | Title | Status |
|---|---|---|---|
| CD-2010-01 | 3/23/10 | Contract Change Management: Work Orders, Force Accounts, Contract Expenditures |
Active |
2009
| CD No. | Date | Title | Status |
|---|---|---|---|
| CD-2009-01 | 5/27/09 | Maintenance of Traffic on Construction Projects: Work Zone Traffic Control (WZTC) Coordinator |
Active |
| CD-2009-02 | 5/15/09 |
Field Change Documentation: Documentation of Field Changes CD-2009-2 that was issued on May 15, 2009 contained some references to design engineer and construction engineer "of record". It was the intent that all reference to the term "of record" be deleted from this CD. Please find attached a corrected copy of this CD as it will be posted on the web. |
Active |
| CD-2009-03 | 5/15/09 | Professional Licensure and Sealing and Signing of Plans: Requirement for Sealing No-Plan Assemblies for Advertisement | Active |
2008
| CD No. | Date | Title | Status |
|---|---|---|---|
| CD-2008-01 | 1/2/2008 | 2007 Road and Bridge Specifications: Distribution and Instructions for Use | Active |
| CD-2008-02 | 1/24/2008 | Inspection Manual: Distribution | Active |
| CD-2008-03 | 3/10/08 | Eliminated Items: Guidelines for Elimination of Contract Items and Materials | Active |
| CD-2008-04 | 3/13/08 | Construction Safety: Memoradum of Understanding: Virginia Occupational Safety and Health | Active |
| CD-2008-05 | 3/13/08 | Maintenance of Traffic: Construction Pavement Markings | Active |
| CD-2008-06 | 3/13/08 | Vertical Clearances: Temporary Reduction in Vertical Clearances | Active |
| CD-2008-07 | 3/13/08 | Environmental and Safety Responsibility: Improving Compliance with Environmental and Safety Laws | Active |
| CD-2008-08 | 3/13/08 | Maintenance of Traffic: Reusing Pavement Marking Tape | Active |
| CD-2008-09 | 3/13/08 | Supply and Quality Requirement: Warranty Coverage | Active |
| CD-2008-10 | 3/13/08 | Non-Payment Claims Against Contractor: Procedures for Handling Non-Payment Claims Against Contractors | Active |
| CD-2008-11 | 4/1/08 | Pipe Replacement or Rehabilitation Contracts: Guidelines for Pipe Culvert Replacement or Rehabilitation - Selection Criteria, Specifications, and Inspection | Active |
| CD-2008-12 | 5/29/08 | Subcontracting: Approval of Sublet Request | Active |
| CD-2008-13 | 6/2/08 | Construction Engineering and Inspection (CEI): FMS-II Phase 9104 (Construction) Activity Codes | Active |
| CD-2008-14 | 7/18/08 | Scheduling Specifications for Category M, I, & II Projects: Special Provisions for Schedule of Operations for Category M Projects and for Progress Schedule for Category I & II Projects |
Active |
| CD-2008-15 | 12/18/08 | Construction Division and/or Directive Memoranda: Sunsetting of Memoranda dated January 1, 2005 and earlier | Active |
2011 - 2014 | 2007 - 2010
2007
| CD No. | Date | Title | Status |
|---|---|---|---|
| CD-2007-01 | 1/18/07 | Materials on Hand: Guidelines for Inventory of Items Paid for as Material on Hand | Sunset |
| CD-2007-02 | Reissued 4/2/07 |
Section 514 Field Offices: Network Connectivity for Field Offices | Sunset |
| CD-2007-03 | Reissued 7/3/07 |
"No Plan" RAAP Process: New "No Plan" RAAP Process |
Sunset |
| CD-2007-04 | 7/24/07 | Contractor's Performance Evaluation: Completion, Submittal and Appeals Process | Active |
| CD-2007-05 | 7/26/07 | Final Acceptance Letter: DBE Goals and SWAM Potential Achievements | Active |
| CD-2007-06 | 7/26/07 | Utilization of Disadvantaged Business Enterprises and Small Women and Minority Firms | Sunset |
| CD-2007-07 | 9/10/07 | Maintenance of Traffic: Guidelines for the Use of Lump Sum Maintenance of Traffic Promotion | Sunset |
| CD-2007-08 | 9/17/07 | Post-Award Schedule management: Policy and Guidelines for the Use of the Special Provision for Progress Schedule from Category I Projects | Sunset |
| CD-2007-09 | 10/8/07 | Project Showing: Guidelines for Project Showings | Active |
| CD-2007-10 | 10/8/07 | Form C-10 for Work Orders: Completion of Form C-10 | Active |
| CD-2007-11 | 12/27/08 | Pre-Advertisement Construction Schedule Developement: Guidelines for Preparing and Submitting the Contract Time Determination Report (CTDR) | Sunset |
|
|